Publications
Sort:
Open Access Issue
Application of Shaped Charge Tubes with Different Materials in Smooth Blasting of Fractured Surrounding Rock
BLASTING 2026, 43(2): 235-244
Published: 15 June 2026
Abstract PDF (11.7 MB) Collect
Downloads:4

This study investigates limitations of conventional shaped-charge blasting in tunnel smooth blasting applications, including excessive charge concentration, operational challenges in charge placement, and induced over-break and surrounding rock damage from concentrated bottom charges. To address these problems, an innovative PVC semi-tubular clasp-shaped charge tube was developed. Following initial effectiveness validation, a reusable steel slit-type charge tube was subsequently designed specifically for weak and fractured surrounding rock mass. Numerical simulations comparing shaped-charge effects between PVC and steel slit-type charge tubes revealed that the steel variant exhibited a substantially greater peak stress concentration at the slit and generated longer fracture propagation lengths than its PVC counterpart. The steel slit-shaped charge tube achieved a peak pressure ratio of 5.51 between the slit and non-slit directions, significantly surpassing the PVC tube's ratio of 1.65, thereby demonstrating superior directional energy concentration and protection of the surrounding rock mass. In double-hole blasting tests, the steel slit-shaped charge tube achieved results equivalent to those of the PVC tube at a significantly lower linear charge density (113 g/m vs. 314 g/m), demonstrating enhanced directional fracturing efficiency and superior protection for the weak and fractured surrounding rock mass. Field tests in jointed tunnel rock confirmed that the PVC-shaped charge tube enabled uniform explosive distribution and controlled directional energy release, effectively increasing half-cast hole rate while minimizing damage to the retained surrounding rock mass. Comparative blasting tests with/without the steel slit-shaped charge tube confirmed its effective directional energy concentration and reusability. Results demonstrate this steel tube's superior suitability for blasting projects in weak and fractured surrounding rock masses, achieving effective disturbance control with reduced explosive quantities while showing significant potential for practical engineering applications and widespread implementation.

Open Access Issue
Mechanism and Application of Partial Weakening by Deep-hole Blasting in Hard Rock Roadways of Coal Mines
BLASTING 2026, 43(3): 64-77
Published: 10 December 2025
Abstract PDF (13.5 MB) Collect
Downloads:3

Mechanical excavation methods have increasingly supplanted blasting techniques in coal mine roadway development. Nevertheless, when encountering hard rock formations, these methods exhibit significantly reduced excavation efficiency coupled with accelerated cutting tool wear. Therefore, this underscores the critical need to develop cost-effective auxiliary rock-fragmentation technologies to optimize mechanical excavation performance. Mechanistic analysis of cutterhead-rock interaction reveals that reduced excavation efficiency results from triaxial failure induced by in-situ stress fields. Furthermore, higher in situ stress magnitudes correlate with increased rock fracture resistance. Progressive cutterhead penetration alters the stress state from triaxial to uniaxial confinement, fundamentally changing the rock failure mode. Higher in-situ stress facilitates rock mass failure. A local stress evolution model was developed based on the Mohr-coulomb criterion. Theoretical calculations demonstrate that for hard rock with 86 MPa uniaxial compressive strength at 300 m depth, the required cutting pressure decreases from 139.5 MPa to 64.2 MPa under two rock-breaking conditions, representing a 54% reduction. To achieve this improvement, a localized deep-hole blasting method for weakening hard rock is proposed. Numerical simulations were conducted to analyze the effect of the empty holes on rock mass blasting damage, leading to the determination of an optimal deep-hole blasting scheme. Field tests at Taitou Qianwan demonstrated the technology′s effectiveness, producing a uniform fragmentation zone approximately 40 cm in diameter and increasing excavation efficiency by 78%. This safe and controllable weakening technique delivers significant results, providing both theoretical foundations and practical solutions to enhance hard-rock roadway excavation rates.

Total 2