This paper considers parallel machine scheduling with special jobs. Normal jobs can be processed on any of the parallel machines, while the special jobs can only be processed on one machine. The problem is analyzed for various manufacturing conditions and service requirements. The off-line scheduling problem is transformed into a classical parallel machine scheduling problem. The on-line scheduling uses the FCFS (first come, first served), SWSC (special window for special customers), and FFFS (first fit, first served) algorithms to satisfy the various requirements. Furthermore, this paper proves that FCFS has a competitive ratio of m, where m is the number of parallel machines, and this bound is asymptotically tight, SWSC has a competitive ratio of 2 and FFFS has a competitive ratio of 3 − 2/m, and these bounds are tight.
Publications
- Article type
- Year
Year
Issue
Tsinghua Science and Technology 2006, 11(1): 107-110
Published: 01 February 2006
Downloads:0
Total 1
京公网安备11010802044758号