With the increasing emphasis of the state on water conservancy projects, the management model of major water conservancy projects is facing new challenges. Given their huge investment scale, long construction period, and high technical complexity, an effective project management model can ensure project quality, progress, and social benefits. Taking the G River regulation project as a case study, this paper constructs an evaluation index system and objectively assigns weights using the CRITIC method. Secondly, through improved TOPSIS decision-making model, combined with the analysis of the virtual worst solution and grey relational degree, a multi-dimensional evaluation is carried out for eight combination schemes, such as “contract awarding method + owner management method”. The results show that “EPC multi-bid section + whole-process consultation” mode performs better in terms of resource integration efficiency, risk diversification ability, and construction period control. Compared with the traditional “EPC single-bid section + whole-process consultation” mode, it improves the management efficiency, verifying the advantages of the collaboration between multi-bid section contract awarding and whole-process consultation.
- Article type
- Year
- Co-author
To analyze the status of spawning habitat for the four major Chinese carps in the lower reaches of the Ganjiang River under varying hydrodynamic conditions, a physical habitat model for fish spawning habitat was established by coupling the two-dimensional hydrodynamic model and the habitat suitability model based on the fuzzy logic method. This model was used to simulate the spatial distribution of suitable spawning areas for the four major carps in the lower reaches of the Ganjiang River under different flow rates, to analyze the variation patterns of the weighted usable area (WUA) of spawning habitat, and to determine the appropriate ecological flow required for spawning. The results show that the overall suitability of the main branch was higher than that of the middle branch and the south branch when the flow rate was low. When the flow was high, the overall suitability of the main branch decreased obviously while the suitability of the middle branch and the south branch increased. The WUA of spawning habitat increased initially and then decreased with increasing flow rate. Compared with the low-flow condition, the WUA decreased faster under the high-flow condition. When the flow rate was 4200 m3/s, the WUA was the largest, accounting for 22.97% of the study area. The suitable ecological flow range of spawning habitat for the four major Chinese carps was between 3500 and 4800 m3/s, and the optimum ecological flow was 4 200 m3/s.
京公网安备11010802044758号