Refined delay blasting using digital electronic detonators has been widely used in rock breaking engineering, where notched borehole could control the direction of explosion-induced crack propagation. This study investigates how delay time affects the propagation behavior of multiple directional cracks through dynamic caustics experiment for delay blasting on specimens with multi-directional notched boreholes to unveil crack propagation path and mechanical properties of crack tip. Results show that multi-directional notched boreholes could effectively control the direction of crack propagation. In both groups of specimens, the main cracks generated by the explosion extended along the notched direction, with cracks from the first borehole longer than those from the second. At 30 μs delay time, cracks between the boreholes showed a "hook-like" distribution at their convergence point, with a larger deflection angle in the cracks from the rear borehole. Propagation velocities, dynamic stress intensity factors and dynamic energy release rates exhibited consistent trends, showing significant increase when the cracks approached each other. Cracks from the first borehole displayed pronounced fluctuations. Both cracks transformed into Ⅰ-Ⅱ mixed mode and then propagated alternately. At 180 μs delay time, the directional control provided by the second borehole's notch was weakened horizontally and formed a "Y-shaped" crack distribution, significantly affecting crack propagation velocity of the first borehole. This study offers references for optimizing delay times and improving rock breaking efficiency.
- Article type
- Year
- Co-author
Open Access
Research Article
Issue
Open Access
Issue
In order to solve the problem of flexural floor heave support under the condition of weak floor with high stress, the supporting form of concrete filled steel tube floor corner pile is put forward. The failure characteristics of the surrounding rock of the flexural floor are studied on the research background of the 18-floor south track roadway of the fourth level in Xing'an Mine. Based on the deflection theory of slab and the virtual work principle, the instability criterion of flexure-type floor under the condition of floor corner pile support is given, and the support mechanism of foundation pile is studied. The results show that the high stress and insufficient strength of surrounding rock are the main reasons for the instability of roadway floor and weakening the stress of floor rock and strengthening the floor rock are the key to control the flexural floor heave. The sectional geometry parameters and pile spacing of piles are the key design parameters to determine the ultimate resistance. The pile length should include the embedding depth of 0.4 R ~ 0.6 R(R is the plastic zone radius), and the pile should be laid through the equivalent circle radius of the roadway section or in a vertical direction. Based on the above research, a field test was carried out on floor corner pile. The field monitoring results show that the pile foundation stress of the floor has a good barrier effect on the compressive stress of the surrounding rock of the roadway floor, and the deformation of the floor and the two sides can be well controlled, and the stability of roadway can be significantly improved. This control technology can provide a reference for roadway floor heave support under similar conditions.
In the field of blasting work, stemming has a significant impact on the effectiveness and safety of blasting operations. To improve the blasting effect and reduce blasting costs, it is essential to determine the optimal length of stemming. This study uses a combination of explosion wave theory, theoretical mechanics, and LS-DYNA numerical simulation to analyze the impact of stemming length on blasting effect, which is then validated through field experiments. The study results indicate that when the blast hole depth is between 0.6 m and 1.4 m, the optimal stemming ratio is between 0.38 and 0.54, and with an increase in blast hole depth, the optimal ratio decreases. When the blast hole depth is between 1.6 m and 2.4 m, the optimal stemming ratio is between 0.36 and 0.38.If the blast hole depth exceeds 1.2 m, and the stemming length equals or exceeds half of the blast hole depth, a detrimental effect may occur. The radial uncoupling coefficient R exerts a significant effect on the optimal stemming length. When R is less than or equal to 1.8, the optimal stemming length decreases with an increase in R. However, when R is greater than 1.8, the optimal stemming length remains unchanged. Additionally, field experiments were conducted at the Wangcun Coal Mine Limited Liability Company 8107 return airway, including tests on 1.2 m and 2.2 m cut holes and a 2.0 m auxiliary hole. The optimal stemming lengths were found to be 50 cm, 90 cm, and 80 cm, respectively, which aligns with the results of theoretical calculation and numerical simulation.
京公网安备11010802044758号