An intelligent decision-making model for energy-saving building strategies based on tacit knowledge
Journal of Tsinghua University (Science and Technology) 2025, 65(1): 53-61
Published: 15 January 2025
Abstract PDF (3.7 MB) Collect
Downloads:36
Objective

To achieve energy-saving and emission reduction in buildings, green building design is increasingly gaining attention. However, traditional design methods often rely heavily on the designer's experience, which complicates the consideration of multidimensional factors such as technical strategies and costs, thus limiting decision-making efficiency. Mining tacit knowledge to support green building design decisions and improve decision-making efficiency presents a significant challenge.

Methods

This study proposes a two-stage intelligent decision-making model for energy-saving building strategies based on tacit knowledge. The first stage employs a case-based reasoning (CBR) model to determine energy-saving technical strategies. A case library containing 147 green-certified buildings provides reference strategies using attributes from the preliminary design phase, such as building type, structure, number of floors, height, orientation, shape coefficient, floor area, and green certification level. Cosine similarity helps retrieve relevant cases and identify technical strategies like window-to-wall ratios, heat transfer coefficients of the building envelope, heat pump loads, and renewable energy use. The second stage involves an incremental cost prediction model that uses machine learning algorithms. A 2∶8 split of the case library into test and training sets enables comparison across four machine learning algorithms: artificial neural network, extreme gradient boosting (XGBoost), support vector machine, and random forest. Each model's prediction accuracy, precision, and F1 score (the harmonic mean of precision and recall) are evaluated. The model takes the technical strategies identified in the first stage and the known information from the preliminary design phase as input feature parameters. The import_plot module analyzes feature importance to eliminate redundant features. The two-stage model is validated on buildings from regions with hot summers and cold winters.

Results

Findings indicate the following: (1) The CBR model effectively identifies and reuses the most similar energy-saving technical strategies, thereby improving decision-making efficiency. Most target cases achieve a similarity greater than 0.8 in the case library. (2) Among the machine learning models, the XGBoost-based incremental cost prediction model exhibits the highest accuracy, achieving 72.41%. (3) By applying the synthetic minority oversampling technique to balance samples and remove outliers, the prediction accuracies for four types of costs reach approximately 70%. However, the prediction accuracy for the fifth type of incremental cost is lower owing to varying owner preferences and requirements.

Conclusions

The proposed two-stage intelligent decision-making model successfully integrates the CBR model with machine learning algorithms. The proposed model optimizes the use of limited known information available during the preliminary design stage to predict both technical strategies and incremental costs. This model enhances the scientific rigor and efficiency of energy-saving decision-making, providing significant support for green building design.

Issue
Impact of construction industrial noise on workers' learning efficiency: A study based on electroencephalogram analysis
Journal of Tsinghua University (Science and Technology) 2024, 64(2): 189-197
Published: 15 February 2024
Abstract PDF (6.5 MB) Collect
Downloads:23
Objective

In this study, the impact of industrial noise on the learning efficiency of construction industry workers was investigated. Twenty-nine workers from a prefabricated component factory were recruited as study participants.

Methods

Industrial noise is generally classified as steady noise and complex noise. Each group of participants was randomly assigned to four different noise interference conditions of one of the two noise types, which were as follows: control group (daily white noise), low noise group (60 dB(A)), medium noise group (70 dB(A)), and high noise group (80 dB(A)). Each experimental session included a 5-minute instructional video and 20 multiple-choice questions related to the video content. The instructional video and test questions were sourced from the National Prefabricated Construction Vocational Skills Competition Exam Question Bank. Furthermore, the content of the instructional videos was designed by training instructors at the component factory to address the practical knowledge needs of the workers, and this content was synthesized into instructional videos. The test questions included knowledge points extracted from the instructional videos. Each instructional video and its corresponding test questions had similar levels of difficulty, with text quantity differences controlled within 10%. During the experiment, electroencephalogram (EEG) data were collected using Emotive-EPOC X EEG equipment. After preprocessing, including filtering, bad segment removal, and independent component analysis, the power spectral density (PSD) values for various frequency bands were extracted from the EEG data. Subsequently, these PSD values were utilized to evaluate the attention and cognitive load levels of the participants during the experiment. Behavioral data (accuracy and reaction time) were collected with psychological software and compared with the cognitive state data. Kruskal-Wallis variance analysis and Mann-Whitney U tests were employed to compare the differences in behavioral data and cognitive state data among the different groups. Pearson's correlation coefficient was utilized to evaluate the relationships between various data sets.

Results

The results of the comparative analysis reveal that, compared to a steady noise environment, a complex noise environment results in lower accuracy and longer reaction times, indicating that complex noise environments are more likely to reduce the learning efficiency of workers. However, within the same noise type, the noise level does not substantially affect the learning efficiency of workers. Moreover, different noise types have no remarkable effect on the cognitive state of workers, and different noise levels in a complex noise environment have no considerable differences in their impact on the worker's cognitive state. In a steady noise environment, different noise levels do not significantly affect cognitive load; however, they do considerably impact attention which significantly decreases when the noise reaches 80 dB(A). Correlation analysis reveals that attention is negatively correlated with cognitive load, and there is no significant correlation between reaction time and accuracy. Attention and cognitive load are not correlated with accuracy. Attention is negatively correlated with reaction time, while cognitive load is positively correlated. This implies that engaging in cognitive tasks increases the workers' cognitive load, leading to decreased attention levels and longer reaction times. Therefore, this study confirms the mediating effect of cognitive states on the relationship between noise and workers' learning efficiency.

Conclusions

This work offers a scientific basis for developing targeted measures to reduce the impact of noise on the cognitive states of construction workers and to enhance their learning efficiency.

Issue
Intelligent identification of rework risk in the prefabricated construction process based on lean management
Journal of Tsinghua University (Science and Technology) 2023, 63(2): 201-209
Published: 15 February 2023
Abstract PDF (12.8 MB) Collect
Downloads:27
Objective

Prefabricated construction features advantages such as improving efficiency, shortening the construction period, and reducing costs. However, the factors represented by the rework process hinder its further development. Rework risk management in an actual project relies mainly on expert experience, making it difficult to efficiently and accurately transfer knowledge and add value. This paper establishes an intelligent ontology for rework risk identification by introducing lean management thinking into rework risk management for the prefabricated construction process. The goals are to identify potential rework risks in advance, block the rework flow between construction processes, and minimize non-value-added activities.

Methods

This paper examines the workflow for identifying rework risks in the prefabricated construction process based on the evolutionary transformation-flow-value (TFV) theoretical model and the information flow model. Integrating the requirements and constraints of the design criteria, production, and construction, the models can demonstrate how an owner's expectations flow between lean design, lean supply, and lean assembly and how to query and share rework risk expertise to drive a project forward. Based on lean management ideas, this paper further constructs an intelligent ontological model for rework risk identification in the prefabricated construction process. To realize the advanced rework risk identification in the prefabricated construction process, this paper establishes an overall design framework including three modules: knowledge management, information processing, and reasoning queries. Building information is stored in a building information modeling (BIM) framework. Rework-risk-related knowledge is usually presented or stored in the form of expert experience, engineering practice, documented information, and project documentation. Using individual data mapping, these unstructured data are semantically expressed and stored in the ontological knowledge base as risk precursors. Based on inference and retrieval algorithms, the specifications related to prefabricated construction are written into the ontological knowledge base as risk determination conditions to achieve intelligent rework risk identification and risk information output for individuals in the prefabricated construction process. A laminated slab example is used to illustrate the rework risk identification process.

Results

The process of identifying the rework risk for a laminated slab example demonstrates the following results: The semantic expression of heterogeneous data such as the BIM model, Internet of Things monitoring data, textual information, and document records provides a means for collecting precursory information regarding risk objects. By using relevant algorithms, project participants can eliminate cumbersome data burdens and capture potential product rework risk and optimization measures more quickly and accurately, which ensures that the rework risks in each process will not be overlooked or misunderstood, as well as eliminate the value outflow to maximize the owner's success.

Conclusions

By building an ontological model for rework risk identification based on lean management, the flow of rework between processes may be blocked to some extent, thus reducing the waste caused by non-value-added behaviors. This paper's process of identifying rework risk combines lean management thinking and semantic web technology, which has significance in promoting the knowledge management of rework risks in prefabricated construction.

Total 3