Risk management of clean energy projects from the dual perspectives of digitalization and partnering
Journal of Tsinghua University (Science and Technology) 2025, 65(1): 92-103
Published: 15 January 2025
Abstract PDF (2 MB) Collect
Downloads:18
Objective

In the past years, the Chinese government has promoted the implementation of clean energy projects to accelerate the transition to green and low-carbon energy in accordance with its "Dual Carbon" target. Clean energy projects involve complex technical, socioeconomic, and environmental risks that cover all stages of engineering, procurement, construction, and operation. Thus, enhancing risk management is essential for effectively mitigating various risks and improving project performance. Studies on the risk management of clean energy projects often focus on specific perspectives and lack systematic investigations of related management issues of clean energy projects. Given the importance of stakeholder collaboration and the application of digital technology in risk management for clean energy projects, this study constructs and empirically validates a conceptual risk management model from the dual perspectives of digitalization and partnering.

Methods

A mixed-method design was adopted, combining qualitative and quantitative approaches to conduct an empirical investigation. To collect quantitative data, a risk management survey questionnaire for clean energy projects was designed based on a literature review and expert interviews and distributed to management and technical personnel from various clean energy projects. Qualitative data were then gathered through expert interviews, field studies, and the collection of project materials, including digital management materials, engineering contracts, risk management cases, and risk management documents. This study also employed structural equation modeling to verify the relationships between variables in the risk management impact relationship model, including knowledge management, project digitization, partnering, participant capability, project performance, and risk management. The questionnaire survey results were analyzed to assess the current state of various management factors, thus providing insights into clean energy project management and identifying key risk management factors.

Results

The results obtained after validating the conceptual risk management impact relationship model reveal that project digitization can directly influence risk management and can also indirectly enhance risk management by promoting knowledge management and improving participant capability. Furthermore, partnering can improve risk management by strengthening enterprise capabilities and facilitating knowledge management. Finally, risk management has a significant positive effect on project performance.

Conclusions

This study proposes and validates a risk management impact relationship model for clean energy projects and reveals the mechanisms influencing risk management from the perspectives of digitization and partnering. The findings indicate that project digitization, partnering, knowledge management, participant capability, and risk management collectively have a significant impact on project performance. Furthermore, this study establishes a measurement indicator system for factors related to clean energy project risk management, facilitating systematic analysis of the current status, obstacles, and causes of these factors. The outcomes of our industry survey also reveal key aspects that should be prioritized in current risk management efforts. From our findings, several risk management strategies for clean energy projects are proposed, including the establishment of a systematic risk management system to strengthen comprehensive risk management, acceleration of the digital transformation of projects to enhance intelligent risk management, improvement of the partnering among project participants to promote collaborative risk management, implementation of a comprehensive knowledge management system to create a learning organization, and enhancement of participant capability to continuously improve project risk management.

Issue
Design management of clean energy projects from the perspective of partnering
Journal of Tsinghua University (Science and Technology) 2025, 65(1): 115-124
Published: 15 January 2025
Abstract PDF (1.2 MB) Collect
Downloads:10
Objective

Developing clean energy is crucial for achieving China's "double carbon" goals, prompting active investment in clean energy projects across the country. However, these projects face a complex external environment with many stakeholders, which makes large-scale grid integration challenging. Moreover, existing projects often suffer from issues such as insufficient energy allocation regulation, mismatched installed capacity and power demand, low economic efficiency in power transmission, and poor synergy effect among projects, mainly owing to inadequate design management. Although design management is vital in clean energy project management, a lack of research is observed from a collaborative perspective among participants.

Methods

This study adopted a mixed research method that combined quantitative research and qualitative research. Quantitative data were obtained through questionnaire surveys, whereas qualitative data were obtained through semistructured interviews and case studies. Respondents included experienced professionals in clean energy project construction, such as owners, designers, suppliers, constructors, and supervisors. Herein, data analysis involved descriptive statistics, mean ranking analysis, difference testing, cluster analysis, and structural equation modeling.

Results

The results show that partnering, feasibility studies, and owner's design management positively impact project performance through two paths: (1) partnering → feasibility study → design performance → project performance and (2) partnering → owner's design management → (feasibility study) → design performance → project performance. During the feasibility study, designers should deeply analyze the supply and demand of the clean energy power market, identify internal and cross-regional power consumption objects, and completely master the basic information of the design. They should rationally select sites, strengthen technical scheme demonstrations, fully consider site and surrounding area constraints, reasonably plan project resettlement and environmental protection, and ensure the project's economic feasibility. In the design process, owners should fully understand national and regional energy policies, deepen their understanding of the project objectives and design needs, and guide design development effectively. The contract should specify the design scope, depth, quality, and schedule requirements and reasonably define the responsibilities, rights, and obligations of all parties. It is crucial to establish a sound design management system, prepare a clear design schedule, and dynamically adjust the schedule as required. Implementing a sound design review, change, and optimization process, identifying design risks, and establishing corresponding control mechanisms are also essential. Developing operable design assessment indicators, reasonable reward and punishment measures, and a design interface management mechanism for stakeholders, along with actively applying information technology, is recommended. Combined with a case analysis, this study offers design management suggestions.

Conclusions

This study proposes and validates a design management model for clean energy projects, revealing the considerable positive effects and pathways of partnering, feasibility studies, and owner's design management on project performance. Through questionnaires and interviews, this study deeply analyze the current state of the feasibility studies and design management, identifying key issues and factors to focus on in clean energy project design. The results provide theoretical and practical references for managing clean energy project design.

Issue
Large-scale infrastructure program management from owners' perspective
Journal of Tsinghua University (Science and Technology) 2025, 65(1): 80-91
Published: 15 January 2025
Abstract PDF (4.6 MB) Collect
Downloads:26
Objective

Large-scale infrastructure is characterized by vast scale, technical complexity, multiple stakeholders, and high risk. Enhancing the efficiency of program management in the context of large-scale infrastructure is crucial for economic and social development in China. Owners are important in the construction of large-scale infrastructure. However, the existing research lacks a comprehensive understanding of key factors involved in program management from owners' perspective and has not systematically explored the underlying mechanisms. This study aims to establish a management capability index system, particularly for program management in the context of large-scale infrastructure from the owners' perspective, and construct and validate a theoretical model for such management activities.

Methods

This study adopted a hybrid approach combining field investigations, surveys, and case studies, focusing on the Shenzhen Bay Super Headquarters Base—a large-scale infrastructure program encompassing 17 projects. During field investigations, qualitative data were gathered based on stakeholders' management needs and challenges associated with large-scale infrastructure program management. Based on an extensive literature review, a questionnaire was designed and distributed to the management and technical personnel operating within the program. This survey generated 407 valid responses, thus providing a robust dataset. The quantitative analysis undertaken employed word frequency and social network analysis to identify primary management demands. Sample mean estimation was employed to gain insights into the current state of program management. Hierarchical cluster analysis was subsequently employed to delineate key owner capabilities critical to effective program management. The proposed theoretical model was tested via partial least squares structural equation modeling (PLS-SEM) to validate the relationships among owners' program-management capabilities, external program conditions, partnership, resource allocation, and program performance. The reliability and validity of the model were rigorously tested, and the model's path coefficients, explanatory power, and predictive power were also assessed.

Results

Textual analysis results identified a pressing requirement for owners to coordinate the design, procurement, and construction stages of projects to optimize the overall effectiveness of program management. Hierarchy cluster analysis results revealed three key program-management capabilities of owners: construction management, dynamic, and information technology capabilities. The PLS-SEM analysis results validated the proposed model, highlighting the notable positive effects of the owners' program-management capabilities and external program conditions on program performance. Specifically, two important paths were identified: (1) owners' program-management capabilities → partnership → (resource allocation) → program performance and (2) external program conditions → partnership→ (resource allocation) → program performance.

Conclusions

The findings of this study offer theoretical insights and practical guidance for enhancing program management in the context of large-scale infrastructure. The findings confirm that the owners are critical stakeholders in managing large-scale infrastructure programs. Comprehensive owners' program-management capabilities can considerably enhance program performance by cultivating partnerships between stakeholders and improving resource allocation. Further, this study highlights the important influence of external program conditions on program outcomes, emphasizing the need for owners to adapt to dynamic external environments. Moreover, practical recommendations are provided for managing large-scale infrastructure programs from owners' perspective, suggesting that owners should systematically identify and address constraints within the program's lifecycle, enhance their dynamic capabilities to effectively adapt to complex external conditions, foster collaborative relationships with diverse stakeholders, and facilitate the integration of advanced information technologies within program management.

Issue
Environmental management of clean energy projects from the partnership perspective
Journal of Tsinghua University (Science and Technology) 2025, 65(1): 104-114
Published: 15 January 2025
Abstract PDF (1.3 MB) Collect
Downloads:8
Objective

The rapid development of clean energy projects under the "Double Carbon" goals highlights the crucial role of environmental management. However, current research often overlooks the impact of cooperation among project participants on environmental outcomes. This study explores how environmental management systems, digital environmental protection, and environmental impact assessments affect the environmental protection management performance of clean energy projects. We focus on building a structural equation model to guide the environmental management of clean energy projects through participant collaboration.

Methods

This study uses a quantitative questionnaire to collect data from owners, designers, constructors, suppliers, and supervisors on key indicators such as participant-builder partnerships, environmental management systems, environmental impact assessments, digital environmental management, environmental management in the construction process, and environmental management of project performance. Using this data, a structural equation model is constructed to measure the path influence coefficients using the quantitative data.

Results

The results show that effective environmental management systems, environmental impact assessments, and digital environmental management promote the construction process and overall project performance. The main role paths identified are the following: "partnership → environmental management system → construction process management → environmental management performance", "partnership → environmental impact assessment → construction process management → environmental management performance", and "partnership → digital environmental management → construction process management → environmental management performance". The research establishes a measurement index system for environmental protection management of clean energy projects. The factors that environmental protection management of clean energy projects should focus on are clarified through the research. Recommendations include: (1) establishing a holistic environmental protection management system to standardize and refine project management; (2) strengthening environmental protection management throughout the project lifecycle, particularly during impact assessment and construction; and (3) implementing digital environmental protection management by establishing an environmental protection information platform to boost efficiency.

Conclusions

This study reveals the influence mechanism of environmental management of clean energy projects, offering empirical support for improvements. It paves the way for realizing efficient environmental protection management for future clean energy projects, improving performance through a robust environmental protection management system, lifecycle management, and digital environmental protection management. The insights provided serve as a reference for environmental protection management of engineering projects including clean energy.

Issue
Analysis of factors influencing construdion and operation of Ningxia's "Internet + urban and rural water supply" project and management recommendations
Journal of Tsinghua University (Science and Technology) 2024, 64(2): 243-249
Published: 15 February 2024
Abstract PDF (2.9 MB) Collect
Downloads:8
Objective

Located in northwest China, Ningxia records low annual precipitation. To address the water supply problems in the region, the Ningxia government actively promotes the "Internet + urban and rural water supply" project, which has become a model for China's urban and rural water supply projects. However, systematic research on the factors affecting the construction and operation of this project, as well as comprehensive research on the improvement and application of the standard system and information technology to this project, are lacking. Thus, the objective of this study is to comprehensively investigate the factors influencing the construction and operation of the Ningxia's "Internet + urban and rural water supply" project for improving the corresponding management system and enhancing project management.

Methods

Questionnaire and interview methods were employed to collect quantitative and qualitative data. First, the factors influencing the Ningxia's "Internet + urban and rural water supply" project construction and operation were identified. Subsequently, to gather quantitative data, questionnaires were given to respondents, namely, owners, designers, constructors, suppliers, supervisors, and users; qualitative data were collected through interviews to verify and supplement the quantitative data. Descriptive statistics was applied to investigate the questionnaire results, while factor analysis was employed to analyze the quantitative results by extracting three key factors from thirteen factors and constructing a factor analysis model.

Results

The results reveal that the factors affecting the construction and operation of the Ningxia's "Internet + urban and rural water supply" project can be reflected in these three extracted key factors, namely, management of water supply project stakeholders, management of water supply information technology, and management of water supply standardization. Moreover, recommendations are proposed for these three key factors. Combining the results of the qualitative research and characteristics of this project, three main recommendations are obtained: (1) It is necessary to improve the management of water supply project stakeholders, build a partnership between project stakeholders, and form long-term project goals based on the residents' demand for water. Based on long-term goals, stakeholders and residents should trust each other, exchange information, and cooperate with each other to improve project performance. (2) It is crucial to enhance the information management of water supply projects by building an intelligent information management platform and using information technology to collect and analyze the data of the entire process behind the "Internet + urban and rural water supply" project. Then, the data is analyzed and used for project optimization, risks prevention, and improving the convenience of urban and rural water use. (3) The standardization system of water supply projects needs to actively summarize the experience of "Internet + urban and rural water supply" projects and apply uniform standards for acceptance.

Conclusions

In this work, the factors influencing the construction and operation of the "Internet + urban and rural water supply" project are presented, and a management system model and empirical evidence for improving the management of this project are provided. This study is conducive to high-quality construction and operation of future urban and rural water supply projects, effectively improving the performance of water supply projects through management of water supply project stakeholders, information management, and construction and application of standardized systems. In addition, this study provides guidance for developing water construction projects, including urban and rural water supply projects.

Issue
Influence mechanism of innovation in the construction industry
Journal of Tsinghua University (Science and Technology) 2024, 64(2): 235-242
Published: 15 February 2024
Abstract PDF (1.3 MB) Collect
Downloads:10
Objective

During project delivery, construction companies must solve technical problems, coordinate complex relationships among stakeholders, adapt to changing client demands and the external market, and consider environmental protection and social development. To this end, construction companies must innovate to improve their competencies. Achieving innovation has become a critical issue for the construction industry. Most existing studies exploring the promotion of construction innovation lack an overall perspective to analyze the impact of innovation management mechanisms on the integration of innovation resources and activities and rarely consider the critical roles of both engineering project innovation and company innovation ability. Therefore, this study comprehensively and systematically reveals the status of innovation in the engineering construction industry. It analyzes and evaluates the company innovation system, inter-organizational knowledge sharing, project implementation processes, and engineering project innovation.

Methods

From the perspective of the construction industry, this study systematically analyzes construction companies' innovation through questionnaire surveys and interviews to build a theoretical model of the construction industry's innovation. The relationships between company innovation systems, inter-organizational knowledge sharing, project implementation processes, engineering project innovation, company innovation ability, and company performance are revealed. In this study, 118 companies in China from the construction industry were selected, and a total of 500 questionnaires were issued to the owners, the designers, the constructors, and the supervisors from the companies, of which 431 were deemed valid. In addition, 110 technical and management personnel from 12 companies were interviewed via on-site and telephone interviews to determine their perspectives and knowledge of innovation in construction industry to provide in-depth interpretations of the quantitative analysis.

Results

The results show that the company innovation system can affect inter-organizational knowledge sharing and the project implementation processes, promote engineering project innovation, improve company innovation ability, and achieve company performance improvement.

Conclusions

This study systematically analyzes the construction industry's innovation, constructs a theoretical model of construction companies' innovation, comprehensively considers the innovation of engineering projects and company innovation ability, and reveals the influence mechanism of construction companies' innovation and its crucial role in company performance. The model is verified using questionnaire surveys and expert interviews. The results indicate that the company innovation system can affect inter-organizational knowledge sharing and the project implementation processes, promote the innovation of engineering projects, improve company innovation ability, and finally improve company performance. These results provide essential theoretical and practical guidance for construction companies.

Issue
Project management of "Internet + urban and rural water supply" based on partnership: Case of Ningxia water supply system
Journal of Tsinghua University (Science and Technology) 2024, 64(2): 250-258
Published: 15 February 2024
Abstract PDF (1.3 MB) Collect
Downloads:18
Objective

In the context of China's promotion of the construction of major water conservancy projects, Ningxia has actively participated in the construction of the "Internet + urban and rural water supply" project. The management of this project is crucial for determining its success or failure. However, current research only analyzes the application of water supply project management to urban and rural water supply projects, lacking empirical analysis on the relationships of water supply project management, partnership, and project performance. This paper uses the Ningxia water supply system as an example to propose a water supply project management model based on stakeholder partnership, which can provide a theoretical foundation for "Internet + urban and rural water supply" project management.

Methods

The present research obtained empirical data using a questionnaire survey method. A partial least square-structural equation model (PLS-SEM) was established using questionnaire data for quantitative analysis to verify the feasibility of the model. Based on the constructed conceptual model and empirical data, a preliminary questionnaire was designed. Further, the Likert 5-point scale method was used to quantitatively assign scores to the questionnaires. Six variables were selected: partnership, demonstration and design management, construction management, operation and maintenance management, "Internet + urban and rural water supply" engineering system operation, and project performance.

Results

This research showed the interaction mechanism between the "Internet + urban and rural water supply" project partnership, project management, and project performance, proving that the stakeholder partnership could strengthen the "Internet + urban and rural water supply" project demonstration and design management, project construction management, and operation and maintenance management, which improved the "Internet + urban and rural water supply" engineering system operation and enhanced the project performance.

Conclusions

Based on the present analyses, the project management of the "Internet + urban and rural water supply" project should be improved from the following aspects: (1) give full consideration to the role of stakeholder partnerships in the early stage of demonstration and design, construction management, and operation and maintenance management of the "Internet + urban and rural water supply" project; (2) utilize information technologies to improve project management, such as building information modeling (BIM) and city information modeling (CIM); (3) establish design, construction, and operation and maintenance management process based on information technology, monitor the status of design, construction, and operation and maintenance in real time, realize dynamic management of design, construction, and operation and maintenance, and ensure achievement of project objectives; (4) utilize the respective advantages of designers, construction parties, and operation and maintenance parties to enhance engineering system operation efficiency, and ultimately achieve project performance.

Issue
Factor analysis and system construction of integrated water resource management in the Xiong'an New Area
Journal of Tsinghua University (Science and Technology) 2023, 63(2): 255-263
Published: 15 February 2023
Abstract PDF (4.7 MB) Collect
Downloads:9
Objective

Located in the Baiyangdian Basin, the Xiong'an New Area is important for the optimization of urban and regional development modes in China. However, the Xiong'an New Area has a weak water resource carrying capacity, and its utilization efficiency of water resources urgently needs improvement. Integrated water resource management refers to systematically considering all aspects of water resource use to improve utilization efficiency, which is crucial for the construction and sustainable development of the Xiong'an New Area. Previous studies have explored integrated water resource management in terms of basin scheduling, market construction, and so on. However, these studies are often limited to a certain aspect of integrated water resource management without a holistic perspective and lack empirical data support. Consequently, this research takes the Xiong'an New Area as the research area, aiming to identify the key aspects contributing to successful integrated water resource management and provide practical and managerial suggestions.

Method

This research conducted a questionnaire survey and interviews to obtain data on the demand and situation of water resource management in the Xiong'an New Area. At the same time, statistics released by the government were collected to reflect the current situation of water resource utilization in the Xiong'an New Area. This research first adopted a descriptive statistical analysis to explore the survey data. Subsequently, principal component analysis was applied to categorize the 16 factors for integrated water resource management into several key aspects for the Xiong'an New Area. Additionally, hierarchical cluster analysis was used to extract the factors, aiming to complement the results of the principal component analysis.

Results

The results show that the Xiong'an New Area has a strong demand for integrated water resource management, and importance should be attached to all factors in the survey. Principal component analysis and hierarchical cluster analysis consistently divide the factors into four categories, indicating that water resource allocation, water-related stakeholder management, intelligent management, and water market regulation should be comprehensively considered to achieve integrated water resource management in the Xiong'an New Area. On the basis of local water resource endowment and the characteristics of water-related stakeholders, this research further structures an integrated water resource management system for the Xiong'an New Area comprising four strategies. (1) Integrated management of stakeholders and water markets recommends that administrative departments should encourage water enterprises to optimize resource allocation through industrial chains, establish a public participation mechanism, give full play to the role of the market in water resource allocation, and realize real-time monitoring of the market and stakeholders. (2) Integrated management of ecological, production, and domestic water consumption should consider the water demands of different stakeholders and encourage industrial restructuring, water recycling, and modernizing water-saving projects. (3) An integrated intelligent management platform for water resource based on information technology should be used to provide convenient, quick, and efficient service to the public, administrative department, and water enterprises.

Conclusions

These findings reveal the key aspects for successful integrated water resource management in the Xiong'an New Area and provide an empirical basis for optimizing the water resource management mode, which could help clarify and reasonably distribute the responsibilities, rights, and interests of local water-related stakeholders and establish a collaborative working mechanism to improve the efficiency of local water resource uses.

Issue
Influence of clients' design management capability on the design performance of water conservancy projects
Journal of Tsinghua University (Science and Technology) 2023, 63(2): 242-254
Published: 15 February 2023
Abstract PDF (1.1 MB) Collect
Downloads:10
Objective

Water conservancy projects play a critical role in irrigation, power generation, water supply, flood control, and navigation. The design processes are of great importance to the water conservancy project delivery with client requirements transformed into reality, thus making it imperative for clients to focus on design management. Poor design management of clients can result in several design problems, such as inadequate understanding of the operational and maintenance requirements in designs, design delay, the high construction cost of design options, and poor design constructability. The client-related design problems can be attributed to their poor design management in contract management, interface management and technical audit of designs, insufficient use of incentives for designers, and inadequate design resources. Existing studies have mainly focused on design management from the designers' perspective. However, a systematic analysis of the impact of clients' design management capability on the design performance has not been conducted so far. Thus, the purpose of this study is to establish and test a conceptual model of clients' design management and reveal the causal relationships between their design management capability, use of incentives for designers, design resource allocation, and design performance in water conservancy projects.

Method

In this study, multiple methods were used to collect qualitative and quantitative data from the field survey on the water conservancy projects in Ningxia, China, including questionnaires, interviews, direct observation, and project document reviews. All respondents had relevant professional experience in project management and either worked at the ministry of water resources in the country or participated in the water conservancy projects in Ningxia. The sample mean estimation, analysis of variance, consistency test, confirmatory factor analysis, and structural equation modeling (SEM) were used to perform the statistical analysis of the quantitative data. Moreover, the bootstrap method was adopted to test the mediating effects in the model.

Results

The results indicate that clients' design management capability has gained acceptance by the participants of the water conservancy projects of Ningxia, while notably, the design-related contract management is more challenging for clients themselves. In addition, clients should give their concern for the trade-off between rewards and punishments for design incentives, as well as optimizing the design period and the allocation of information resources. The SEM results confirm three paths from clients' design management capability to the design performance of water conservancy projects with the standardized regression coefficients under a significance level of 0.001. The first path is clients' design management capability → design performance; the second path is clients' design management capability → design resource allocation → design performance; and the third path is clients' design management capability → use of incentives for designers→ design resource allocation → design performance.

Conclusions

This study reveals that clients' design management capability can directly promote resource allocation and also exert an effect on design resource allocation through the use of incentives, thereby achieving a superior design performance. The use of incentives and design resource allocation contribute a chain mediating effect to clients' design management capability and design performance. The findings of this study can provide theoretical and practical guidance for the clients of water conservancy projects to conduct effective design management and improve design outcomes. The clients are suggested to enhance design management through improving their capabilities of design-related contract management, interface management and technical audit capabilities, and effectively allocating resources for the front-end design, geological exploration equipment, design period and information management, as well as applying incentives to motivate design optimization and innovation.

Issue
Integrated management of waterworks through value co-creation: A case study of the Xiong'an New Area
Journal of Tsinghua University (Science and Technology) 2023, 63(2): 272-282
Published: 15 February 2023
Abstract PDF (1.6 MB) Collect
Downloads:5
Objective

The management of waterworks should be integrated from a holistic view. Existing studies mostly focus on a single perspective, and there is a lack of systematic research on how to realize integrated management of waterworks at the basin, region, and project levels through stakeholder cooperation. Based on the value co-creation theory, we establish a conceptual model for the integrated management of waterworks from different spatial scales and explain why and how the relevant government departements adopt measures to achieve integrated management of waterworks.

Method

We considered the Xiong'an New Area in China as an example and adopted a single-case method to explore the law behind the phenomenon. Following the data collection method of triangulation verification, multiple methods were used to collect both quantitative and qualitative data, including questionnaires, interviews, direct observation, and internal and external document review, such as official reports, archives, policy documents, and media reports. The Likert-5 score method was used to design the questionnaire, and 87 questionnaires were collected to evaluate the management needs of waterworks. SPSS 24.0 software was applied to perform the sample mean estimation and calculate the Cronbach's α for the reliability test to analyze quantitative data in this study. For qualitative data, we adopted the grounded theory to perform open coding, principal coding, and selective coding successively to extract the required information. Furthermore, we established a model for the integrated management of waterworks and demonstrated the urgent needs for waterworks integration in terms of policies, management, and markets.

Results

All ratings of waterworks management needs are greater than 4, indicating that the Xiong'an New Area has urgent management needs in flood control and drainage, ecological protection, and utilization of water resources. Through independent qualitative data analysis and coding by two researchers, 3 core categories, 12 main categories, and 24 subcategories are clustered according to the grounded theory and the core contents related to the research topic are extracted, including the integrated management needs of waterworks, the value co-creation process, and the integrated management of waterworks. The results show that the integrated management of waterworks requires the water management department to take the lead and coordinate with other government departments, water users, and project participants to jointly create value with the support of information technology to achieve multiple management objectives.

Conclusions

This study reveals the value co-creation process of all stakeholders in the integrated management of waterworks and makes suggestions for the government to manage waterworks, including (1) establishing a unified water management department to take responsibility for the entire management process of waterworks, (2) cooperating with other government departments to establish a coordinated operation mechanism combining drainage basins and regions for waterworks, (3) monitoring water demand and interactive feedback with water users as well as implementing dynamic water supply for production, domestic, and ecological use, (4) developing a unified operation management system to improve the operation efficiency, and (5) effectively supervising the project participants of waterworks and integrating the planning, design, construction, and operation of waterworks to promote the optimal allocation of industrial chain resources. The findings of this study provide references for government water management departments to coordinate stakeholders for the integrated management of waterworks.