The integrated electricity-gas system (IEGS) is the foundation of the Energy Internet. As inevitable risk factors, the widespread blackout and large-scale energy supply disruptions represent serious threats to the IEGS. Improving the load restoration ability of IEGS is an important measure to mitigate the harm caused by blackouts. However, the increasing penetration of wind power has posed some difficulties to IEGS load restoration. In view of this, based on distributionally robust optimization (DRO), a two-stage IEGS restoration model is developed in this paper. Through a detailed mathematical model of an electric power system (EPS) with multiple generating resources and a natural gas system (NGS) with dynamic characteristics, the supporting role of the NGS operation flexibility for IEGS restoration is fully explored and quantitatively analyzed. Through the construction of a Wasserstein metric-based ambiguity set of wind power forecast deviation, the proposed two-stage IEGS restoration model can incorporate operational risks when the uncertainty of wind power output is encountered and also take into account the flexible reserve capacity (FRC) allocation and deployment constraints. The proposed model can realize the reasonable scheduling of wind power, automatically determine the allocation of the required FRC, and optimize the load restoration schemes. Moreover, the proposed model can be converted into a mixed integer linear programming problem which can be directly solved. In the case study, the advantages of the proposed model are compared with three conventional restoration models based on two test systems, and sensitivity analysis is conducted.
- Article type
- Year
Open Access
Regular Paper
Issue
Open Access
Regular Paper
Issue
This paper proposes a multi-time collaborative restoration model for integrated electricity-gas distribution systems (IEGDSs) considering multiple resources after extreme weather events. Based on the linearized power flow constraints of the unbalanced electrical distribution system (EDS) and gas distribution system (GDS), this problem can be formulated as a mixed-integer linear programming (MILP) model. To improve the efficiency and veracity of the solution, a rolling optimization based two-stage method is developed with the first stage solved by a linear approximation model, and the second stage solved by real-time updated rolling optimization. By solving the MILP problem using rolling optimization, the proposed model and solution method achieve efficient and reliable collaborative restoration of IEGDS considering multiple resources and unbalanced operation characteristics of EDS. The effectiveness of the proposed model and method is validated by using an IEGDS made of a 37-bus unbalanced EDS and 11-node GDS.
Open Access
Regular Paper
Issue
The competition among renewable power producers (RPPs) may cause the cleared power of RPPs to be less than the bidding power, while the impact of competition is neglected in the existing price-taker methods. To overcome the above deficiency, this paper develops an optimal bidding strategy, considering the competition among RPPs. First, a bivariate stochastic optimization (BSO) model for a bidding strategy is proposed by considering the variable power output of RPPs and the competition among RPPs. Particularly, the cleared power estimated by the demand-supply ratio is a random variable in the proposed BSO model. Then, the Newton method and particle swarm optimization (PSO) are combined to solve the BSO model in which various probability distribution functions (PDFs) of renewable energy generation are considered. Finally, the effectiveness of the proposed method is verified based on the results of a case study, which shows that the proposed model performed better than the traditional chance-constrained programming (CCP) model in power market competition.
京公网安备11010802044758号