On the basis of site investigation and data collection of a certain electro plating factory, the groundwater flow and solute transport coupled models were established by applying Visual MODFLOW 4.1 software, which was used to conduct a numerical simulation that forecast the transport process of Cr6+ in groundwater. The results show that contamination plume of Cr6+ transports with groundwater flow direction. Without control measures, in 3650 days, 19 wells for drinking would be contaminated, and the range of transport would be 52172 m2, the maximum contamination would be 35.8 mg/L.
Publications
- Article type
- Year
Year
Issue
Journal of Groundwater Science and Engineering 2014, 2(3): 28-35
Published: 28 September 2014
Downloads:77
Total 1
京公网安备11010802044758号