AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (3.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Study on mid- and long-term multi-objective optimal operation of cascade reservoirs considering water abandonment risk

Guohua FANG1, Haizheng WANG2, Chengjun WU3, Xianfeng HUANG1, Zhongmei WANG3
College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China
China Renewable Energy Engineering Institute, Beijing 100120, China
Yellow River Institute of Hydraulic Research, YRCC, Zhengzhou 450003, China
Show Author Information

Abstract

Aiming at the problem of significant deviation between the calculation results of abandoned water risk in existing hydropower stations and the actual situation, based on the principle of water balance, a cascade reservoir abandoned water risk quantification method coupling runoff and load dual uncertainties was proposed by identifying abandoned water risk factors. The concept of critical abandonment probability was introduced, and a method for determining the critical abandonment probability of cascade reservoirs based on the joint minimum of warning false alarm rate and missed alarm rate, as well as a method for controlling the water level drop of cascade reservoirs at the end of the water supply period based on the critical abandonment probability, were proposed. On this basis, a mid- and long-term multi-objective optimal operation model considering the abandoned water risk in cascade reservoirs was constructed, and a case study was conducted on the Wujiang cascade reservoir group. The results show that there is a significant monotonic increasing relationship between the abandoned water probability and the abandoned water flow rate in the Wujiang cascade reservoir group. The two-stage scheme of coupling operation period and residual period has increased the power generation efficiency by about 0. 51% compared to the conventional optimized scheduling scheme, and the ecological efficiency has increased by about 1. 06 times.

CLC number: TV697 Document code: A Article ID: 1004-6933(2024)06-0020-08

References

【1】
【1】
 
 
Water Resources Protection
Pages 20-27

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
FANG G, WANG H, WU C, et al. Study on mid- and long-term multi-objective optimal operation of cascade reservoirs considering water abandonment risk. Water Resources Protection, 2024, 40(6): 20-27. https://doi.org/10.3880/j.issn.1004-6933.2024.06.003

800

Views

2

Downloads

0

Crossref

0

Web of Science

7

Scopus

0

CSCD

Received: 26 March 2024
Published: 20 November 2024
© Journal of Water Resources Protection