AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Risk dispatching model of cascade hydropower station reservoirs considering power generation and water abandonment risks

Ziyu DING1,2, Guohua FANG2( ), Yingchi MAO1, Yanzhe LIU2,3, Guangzhi YANG1, Ming XU4
College of Computer Science and Software Engineering, Hohai University, Nanjing 211100, China
College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China
Shanghai Water Conservancy Engineering Design and Research Institute Co., Ltd., Shanghai 200061, China
Jiangsu Province Water Engineering Sci-Tech Consulting Co., Ltd., Nanjing 210029, China
Show Author Information

Abstract

To quantify the risk situation during the operation of cascade hydropower station reservoirs, a risk operation model driven by forecast information was proposed. Based on long-short term memory (LSTM) neural network, a risk situation prediction model was established. By constructing a mapping relationship between predicted inflow runoff, reservoir operating conditions, scheduling decisions, output damage degree, and abandoned water volume, the risk of reservoir scheduling in cascade hydropower stations under complex operating conditions was dynamically deduced. A risksituation based scheduling model for cascade hydropower station reservoirs was established, and risk pre control models for insufficient power generation and water abandonment were proposed. A case study was conducted on a cascade hydropower station consisting of the Jinping Ⅰ Reservoir and the Ertan Reservoir in the lower reaches of the Yalong River Basin. The results show that compared to the conventional maximum power generation model, the risk scheduling model compensates for future output shortage periods by reducing a certain amount of output in advance, reducing the depth of output shortage of the Jinping Ⅰ Reservoir and Ertan Reservoir by 46% and 63%, respectively. Additionally, it increases power generation discharge in advance to reserve storage capacity, thus alleviating the water surplus in the subsequent periods in the wet season, leading to a reduction of total water surplus of the Jinping Ⅰ Reservoir and Ertan Reservoir by 4.8% and 5.4%, respectively. The risk situation prediction model can incorporate the uncertainty of inflow into the risk scheduling model, enabling dynamic response to the operational state of the hydropower station reservoir and changes in inflow situation through risk control decisions.

CLC number: TV697.1+2 Document code: A Article ID: 1004-6933(2024)02-0100-07

References

【1】
【1】
 
 
Water Resources Protection
Pages 100-106

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
DING Z, FANG G, MAO Y, et al. Risk dispatching model of cascade hydropower station reservoirs considering power generation and water abandonment risks. Water Resources Protection, 2024, 40(2): 100-106. https://doi.org/10.3880/j.issn.1004-6933.2024.02.013

777

Views

6

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 20 June 2023
Published: 20 March 2024
© Journal of Water Resources Protection