Discover the SciOpen Platform and Achieve Your Research Goals with Ease.
Search articles, authors, keywords, DOl and etc.
Aiming at the water resource dispatching and allocation problem in the receiving area of the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project, with the goal of minimizing the total water shortage in the receiving area and the total energy consumption of the pumping station, a water resource optimization scheduling model of the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project was established. The transfer water from the South-to-North Water Transfer Project was jointly allocated with local water resources, and the water resources allocation model for the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project was constructed with the goal of maximizing economic, social, and environmental benefits. The model simulation was conducted using the basic scheme and water-saving scheme and the results show that under the three conditions of 50%, 75%, and 95% precipitation guaranteed rates, the water shortage rate of the water-saving scheme in the receiving area decreased by 2.91%, 3.61%, and 3.83% compared to the basic scheme, respectively. Under the water-saving scheme in receiving area, each project has basically completed the water supply task in the receiving area, and prioritized the use of the Yunxi Line, which has a lower unit energy consumption of the pumping station, for water transfer. This indicates that the optimized dispatching and allocation model can operate in a more economical and energy-saving way while ensuring water use in the receiving area.
Comments on this article