AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Study on water resources dispatching and allocation in Jiangsu Section of Eastern Route Project of South-to-North Water Diversion Project

Guohua FANG1( ), Wencui ZHAO2, Xin LI1, Xin WEN1, Bingyi ZHOU1
College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China
Jiangsu Province Water Engineering Sci-tech Consulting Co., Ltd., Nanjing 210029, China
Show Author Information

Abstract

Aiming at the water resource dispatching and allocation problem in the receiving area of the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project, with the goal of minimizing the total water shortage in the receiving area and the total energy consumption of the pumping station, a water resource optimization scheduling model of the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project was established. The transfer water from the South-to-North Water Transfer Project was jointly allocated with local water resources, and the water resources allocation model for the Jiangsu Section of the East Route Project of the South-to-North Water Diversion Project was constructed with the goal of maximizing economic, social, and environmental benefits. The model simulation was conducted using the basic scheme and water-saving scheme and the results show that under the three conditions of 50%, 75%, and 95% precipitation guaranteed rates, the water shortage rate of the water-saving scheme in the receiving area decreased by 2.91%, 3.61%, and 3.83% compared to the basic scheme, respectively. Under the water-saving scheme in receiving area, each project has basically completed the water supply task in the receiving area, and prioritized the use of the Yunxi Line, which has a lower unit energy consumption of the pumping station, for water transfer. This indicates that the optimized dispatching and allocation model can operate in a more economical and energy-saving way while ensuring water use in the receiving area.

CLC number: TV212 Document code: A Article ID: 1004-6933(2023)04-0001-08

References

【1】
【1】
 
 
Water Resources Protection
Pages 1-8

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
FANG G, ZHAO W, LI X, et al. Study on water resources dispatching and allocation in Jiangsu Section of Eastern Route Project of South-to-North Water Diversion Project. Water Resources Protection, 2023, 39(4): 1-8. https://doi.org/10.3880/j.issn.1004-6933.2023.04.001

579

Views

7

Downloads

0

Crossref

0

Web of Science

11

Scopus

0

CSCD

Received: 19 August 2022
Published: 20 July 2023
© Journal of Water Resources Protection