AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (10.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Coupled model of dam breaches and levee overtopping and sensitivity analysis of inundation areas based on high-precision DEM

Zaikang YU1, Jing CHENG2( ), Junzhen WANG1, Chuisui KONG3, Weiguo YAN1
Guizhou Dam Safety Monitoring Center, Guiyang 550002, China
College of Water Conservancy & Hydropower Engineering, Hohai University, Nanjing 210098, China
Shanghai Water Conservancy Engineering Design and Research Institute Co., Ltd., Shanghai 200232, China
Show Author Information

Abstract

To more accurately simulate the inundation process of inundation areas downstream of small-sized reservoirs after dam breaches and reveal the coupling mechanisms of dam breaches and levee overtopping, the DaYJ Reservoir in Guizhou Province was studied. Digital elevation measurements and orthophoto imaging were conducted in the reservoir area and downstream flood-prone areas. A coupled model of dam breaches and levee overtopping was developed based on a high-precision DEM, and sensitivity analyses were performed within the study area regarding flood depth, flow velocity, and flood severity relative to levee height. The results indicate that compared with the single dam breach model, the coupled model of dam breach and levee overtopping can more realistically simulate the changes in the inundation range downstream over time. When the levee height is no more than 1 m, overtopping is highly probable. A transitional state between levee overtopping and non-overtopping occurs at a levee height of approximately 1.5 m. When the levee height exceeds 1.7 m, overtopping is entirely prevented, and the flood primarily bypasses the levee from its end, inundating residential areas. As levee height increases, the arrival time of the flood, the emergence time of a 0.3 m water depth, and the occurrence time of the peak flow velocity are all delayed. Furthermore, both the maximum flow velocity and the peak flood severity within the study area of levee overtopping generally decrease and become more uniformly distributed.

CLC number: TV122.4 Document code: A Article ID: 1000-1980(2025)04-0080-09

References

【1】
【1】
 
 
Journal of Hohai University (Natural Sciences)
Pages 80-88

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YU Z, CHENG J, WANG J, et al. Coupled model of dam breaches and levee overtopping and sensitivity analysis of inundation areas based on high-precision DEM. Journal of Hohai University (Natural Sciences), 2025, 53(4): 80-88. https://doi.org/10.3876/j.issn.1000-1980.2025.04.010

676

Views

0

Downloads

0

Crossref

0

Scopus

1

CSCD

Received: 16 August 2024
Published: 25 July 2025
© 2025 Journal of Hohai University (Natural Sciences)