AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (12.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Intelligent identification of rework risk in the prefabricated construction process based on lean management

Xinying CAO1, Fanfan MENG1, Xiaodong LI2( )
Department of Construction Management, Hainan University, Haikou 570228, China
Department of Construction Management, Tsinghua University, Beijing 100084, China
Show Author Information

Abstract

Objective

Prefabricated construction features advantages such as improving efficiency, shortening the construction period, and reducing costs. However, the factors represented by the rework process hinder its further development. Rework risk management in an actual project relies mainly on expert experience, making it difficult to efficiently and accurately transfer knowledge and add value. This paper establishes an intelligent ontology for rework risk identification by introducing lean management thinking into rework risk management for the prefabricated construction process. The goals are to identify potential rework risks in advance, block the rework flow between construction processes, and minimize non-value-added activities.

Methods

This paper examines the workflow for identifying rework risks in the prefabricated construction process based on the evolutionary transformation-flow-value (TFV) theoretical model and the information flow model. Integrating the requirements and constraints of the design criteria, production, and construction, the models can demonstrate how an owner's expectations flow between lean design, lean supply, and lean assembly and how to query and share rework risk expertise to drive a project forward. Based on lean management ideas, this paper further constructs an intelligent ontological model for rework risk identification in the prefabricated construction process. To realize the advanced rework risk identification in the prefabricated construction process, this paper establishes an overall design framework including three modules: knowledge management, information processing, and reasoning queries. Building information is stored in a building information modeling (BIM) framework. Rework-risk-related knowledge is usually presented or stored in the form of expert experience, engineering practice, documented information, and project documentation. Using individual data mapping, these unstructured data are semantically expressed and stored in the ontological knowledge base as risk precursors. Based on inference and retrieval algorithms, the specifications related to prefabricated construction are written into the ontological knowledge base as risk determination conditions to achieve intelligent rework risk identification and risk information output for individuals in the prefabricated construction process. A laminated slab example is used to illustrate the rework risk identification process.

Results

The process of identifying the rework risk for a laminated slab example demonstrates the following results: The semantic expression of heterogeneous data such as the BIM model, Internet of Things monitoring data, textual information, and document records provides a means for collecting precursory information regarding risk objects. By using relevant algorithms, project participants can eliminate cumbersome data burdens and capture potential product rework risk and optimization measures more quickly and accurately, which ensures that the rework risks in each process will not be overlooked or misunderstood, as well as eliminate the value outflow to maximize the owner's success.

Conclusions

By building an ontological model for rework risk identification based on lean management, the flow of rework between processes may be blocked to some extent, thus reducing the waste caused by non-value-added behaviors. This paper's process of identifying rework risk combines lean management thinking and semantic web technology, which has significance in promoting the knowledge management of rework risks in prefabricated construction.

CLC number: TU17 Document code: A Article ID: 1000-0054(2023)02-0201-09

References

【1】
【1】
 
 
Journal of Tsinghua University (Science and Technology)
Pages 201-209

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
CAO X, MENG F, LI X. Intelligent identification of rework risk in the prefabricated construction process based on lean management. Journal of Tsinghua University (Science and Technology), 2023, 63(2): 201-209. https://doi.org/10.16511/j.cnki.qhdxxb.2022.22.051

1019

Views

27

Downloads

0

Crossref

5

Scopus

2

CSCD

Received: 19 July 2022
Published: 15 February 2023
© Journal of Tsinghua University (Science and Technology). All rights reserved.