AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Risk management of water conservancy projects: Taking water conservancy projects in Ningxia as an example

Changsheng LOU1, Wenzhe TANG1( ), Tengfei WANG2
State Key Laboratory of Hydroscience and Engineering, Department of Hydraulic Engineering, Tsinghua University, Beijing 100084, China
Student Office, Tsinghua University, Beijing 100084, China
Show Author Information

Abstract

Objective

Water conservancy projects are complex and closely interact with the economy, society, and environment, involving multiple participants. Thus, there is a need to systematically manage risks to water conservancy projects with the support of information technology to effectively control risks and reduce losses.

Method

This study presents a risk management model for water conservancy projects, which can help understand the relationships between incentives, collaboration among participants, risk management processes, and information management platforms for water conservancy projects. Practically, the model can assist participants in efficiently managing project risks holistically. The model is validated by a survey of water conservancy projects in Ningxia, China. Quantitative and qualitative data were collected through a survey method mainly based on a questionnaire survey, supplemented by interviews and field investigation. The indicators were constructed based on literature research, and the 5-point Likert scoring method was used to quantify these indicators. The questionnaire consists of four parts: (1) In the section on risk factors of water conservancy projects, the influence and possibility of risks of water conservancy projects were evaluated. (2) In the section on the risk management system of the participating parties, the current situation of the risk management of each participant was analyzed to comprehensively evaluate the risk management level of each participant in water conservancy projects. (3) In the section on risk management methods, the use of risk management methods by the participants in each stage of risk management was evaluated. (4) In the section on risk management constraints, the main obstacles encountered by each participant in the risk management processes were summarized. Based on the mean value analysis of the questionnaire data and the interviews with each participant involved in the construction of water conservancy projects, we systematically analyzed the current situation of risk management of water conservancy projects in Ningxia.

Results

The survey results on risk management of water conservancy projects in Ningxia show that: (1) The main risks in water conservancy projects include construction safety issues, poor hydrogeological conditions, insufficient construction management capabilities, and resettlement issues. (2) Each participant in water conservancy projects needs to further improve their risk management systems to improve the level of risk management. (3) Risk analysis of water conservancy projects is mainly judged by the technical and management personnel relying on experience. Qualitative analysis is mainly used in risk analysis. Meanwhile, quantitative analysis has not been conducted. (4) The main constraints of risk management of water conservancy projects include the lack of a joint risk management system, insufficient information support for risk management, and irrational risk distribution among each participant in the construction.

Conclusions

Through the research on risk management of water conservancy projects in Ningxia, this study provides suggestions on risk management and helps the participants further improve their risk management capabilities. Risk management of water conservancy projects should (1) establish a formal risk management system; (2) create a collaborative risk management mechanism; (3) use appropriate incentives; and (4) develop an information management platform consisting of a water conservancy project risk database, a collaborative work system, and a decision-making support system.

CLC number: F407.9 Document code: A Article ID: 1000-0054(2023)02-0233-09

References

【1】
【1】
 
 
Journal of Tsinghua University (Science and Technology)
Pages 233-241

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
LOU C, TANG W, WANG T. Risk management of water conservancy projects: Taking water conservancy projects in Ningxia as an example. Journal of Tsinghua University (Science and Technology), 2023, 63(2): 233-241. https://doi.org/10.16511/j.cnki.qhdxxb.2022.22.049

1209

Views

11

Downloads

0

Crossref

4

Scopus

2

CSCD

Received: 23 June 2022
Published: 15 February 2023
© Journal of Tsinghua University (Science and Technology). All rights reserved.