AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article | Just Accepted

Two-phase flow vortex dynamics and sediment deposition control in composite pump station forebays

Haidong Wang1,2,3, Dong Xu2,3( ), Qihua Ran2,3, Saiyu Yuan2,3, Hongwu Tang2,3

1 School of Civil and Hydraulic Engineering, Ningxia University, Yinchuan 750021, China

2 Key Laboratory of Hydrologic-Cycle and Hydrodynamic-System of Ministry of Water Resources, Hohai University, Nanjing 210098, China

3 College of Water Conservancy & Hydropower Engineering, Hohai University, Nanjing 210098, China

Show Author Information

Abstract

The coexistence of lateral and forward forebays defines a composite pump station forebay. The flow channel undergoes significant alterations due to curved sidewalls and directional changes in water–sediment flow, causing boundary layer separation and multiple vortex zones. In the Yellow River, sediment readily accumulates within vortices, leading to sedimentation in the forebay and affecting pump operation. Existing research has not comprehensively addressed this issue. This study pioneers an investigation into water–sediment two-phase flow in composite forebays using the Euler model to describe fluid dynamics, analyze vortex formation mechanisms, and predict high-sediment areas. Based on this verification, the accuracy of the numerical simulation was validated through measurement results, and a series of twenty distinct cases were introduced to investigate variations in water–sediment transport in the composite forebay. The findings suggest optimal positioning of the diversion pier on the sloped forebay section at a 135° angle to enhance flow patterns; closer spacing between single pressure plates and inlet length affects vortices, and decreased spacing between double plates suppresses vortices in the forward forebay. In the optimized case, the interaction between the diversion pier and pressure plate improves the average velocity uniformity by 26.04%, with an 81.65% reduction in the vortex area. Under the Q criterion, the vortex structure is minimized, resulting in a sediment deposition rate of only 0.62%. The sediment deposition amount decreases by 77.18% compared to the original case, highlighting the improved efficiency in reducing sediment retention and enhancing pump station performance. These findings offer critical theoretical insights for pump station engineering.

References

【1】
【1】
 
 
Experimental and Computational Multiphase Flow

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang H, Xu D, Ran Q, et al. Two-phase flow vortex dynamics and sediment deposition control in composite pump station forebays. Experimental and Computational Multiphase Flow, 2026, https://doi.org/10.1007/s42757-025-0270-1

335

Views

16

Downloads

0

Crossref

0

Web of Science

0

Scopus

Received: 25 March 2025
Revised: 13 May 2025
Accepted: 22 June 2025
Available online: 20 May 2026

© Tsinghua University Press 2026.