Research Article

AutoBPS-BIM: A toolkit to transfer BIM to BEM for load calculation and chiller design optimization

Zhihua Chen1, Zhang Deng1, Adrian Chong3, Yixing Chen1,2( )
College of Civil Engineering, Hunan University, Changsha, Hunan 410082, China
Key Laboratory of Building Safety and Energy Efficiency (Hunan University), Ministry of Education, China
Department of Building, National University of Singapore, 4 Architecture Drive, 117566, Singapore
Show Author Information

Abstract

This study developed a rapid building modeling tool, AutoBPS-BIM, to transfer the building information model (BIM) to the building energy model (BEM) for load calculation and chiller design optimization. An eight-storey office building in Beijing, 33.2 m high, 67.2 m long and 50.4 m wide, was selected as a case study building. First, a module was developed to transfer BIM in IFC format into BEM in EnergyPlus. Variable air volume systems were selected for the air system, while water-cooled chillers and boilers were used for the central plant. The EnergyPlus model calculated the heating and cooling loads for each space as well as the energy consumption of the central plant. Moreover, a chiller optimization module was developed to select the optimal chiller design for minimizing energy consumption while maintaining thermal comfort. Fifteen available chillers were included, with capacities ranging from 471 kW to 1329 kW. The results showed that the cooling loads of the spaces ranged from 33 to 100 W/m2 with a median of 45 W/m2, and the heating load ranged from 37 to 70 W/m2 with a median of 52 W/m2. The central plant’s total cooling load under variable air volume systems was 1400 kW. Compared with the static load calculation method, the dynamic method reduced 33% of the chiller design capacity. When two chillers were used, different chiller combinations’ annual cooling energy consumption ranged from 10.41 to 11.88, averaging 11.12 kWh/m2. The lowest energy consumption was 10.41 kWh/m2 when two chillers with 538 kW and 1076 kW each were selected. Selecting the proper chiller number with different capacities was critical to achieving lower energy consumption, which achieved 12.6% cooling system energy consumption reduction for the case study building. This study demonstrated that AutoBPS-BIM has a large potential in modeling BEM and optimizing chiller design.

References

【1】
【1】
 
 
Building Simulation
Pages 1287-1298

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Chen Z, Deng Z, Chong A, et al. AutoBPS-BIM: A toolkit to transfer BIM to BEM for load calculation and chiller design optimization. Building Simulation, 2023, 16(7): 1287-1298. https://doi.org/10.1007/s12273-023-1006-4

1610

Views

28

Crossref

29

Web of Science

32

Scopus

1

CSCD

Received: 28 November 2022
Revised: 31 January 2023
Accepted: 14 February 2023
Published: 19 April 2023