AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Article Link
Collect
Submit Manuscript
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article

A data-driven model predictive control for lighting system based on historical occupancy in an office building: Methodology development

Yuan Jin1Da Yan1( )Xingxing Zhang2Jingjing An1Mengjie Han2
School of Architecture, Tsinghua University, Beijing 100084, China
School of Industrial Technology and Business Studies, Dalarna University, Falun 79188, Sweden
Show Author Information

Abstract

The lighting system accounts for 8% of the total electricity consumption in commercial buildings in the United States and 12% of the total electricity consumption in public buildings globally. This consumption share can be effectively reduced using the demand-response control. The traditional lighting system control method commonly depends on the real-time occupancy data collected using the passive infrared (PIR) sensor. However, the detection inaccuracy of the PIR sensor usually results in false-offs. To diminish the false-error frequency, the existing lighting system control simply deploys a delayed reaction period (e.g., 5 to 20 min), which is not sufficiently accurate for the demand-response operation. Therefore, in this research, a novel data-driven model predictive control (MPC) method that is based on the temporal sequential-based artificial neural network (TS-ANN) is proposed to overcome this challenge using an updated historical occupancy status. Using an office as case study, the proposed model is also compared with the traditional lighting system control method. In the proposed model, the occupancy data was trained to predict the occupancy pattern to improve the control. It was found that the occupancy prediction mainly correlates with the historical occupancy ratio and the time sequential feature. The simulation results indicated that the proposed method achieved higher accuracy (97.4%) and fewer false-offs (from 79.5 with traditional time delay method to 0.6 times per day) are achieved by the MPC model. The proposed TS-ANN-MPC method integrates the analysis of the occupant behavior routine into on-site control and has the potential to further enhance the control performance practice for maximum energy conservation.

References

【1】
【1】
 
 
Building Simulation
Pages 219-235

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Jin Y, Yan D, Zhang X, et al. A data-driven model predictive control for lighting system based on historical occupancy in an office building: Methodology development. Building Simulation, 2021, 14(1): 219-235. https://doi.org/10.1007/s12273-020-0638-x

1167

Views

45

Crossref

N/A

Web of Science

55

Scopus

13

CSCD

Received: 18 September 2019
Accepted: 26 March 2020
Published: 13 May 2020
© Tsinghua University Press and Springer-Verlag GmbH Germany, part of Springer Nature 2020