AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (8.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Task planning for multi-spacecraft non-order-conserving parallel assembly

Chengfei YUE1,2Xiao ZHANG1Xibin CAO2,3( )
School of Aerospace Science, Harbin Institute of Technology Shenzhen, Shenzhen 518055, China
State Key Laboratory of Micro-Spacecraft Rapid Design and Intelligent Cluster, Harbin Institute of Technology, Harbin 150001, China
Research Center of Satellite Technology, Harbin Institute of Technology, Harbin 150001, China
Show Author Information

Abstract

Spacecraft assembly task planning system and sequence allocation planning method are proposed to address the problem of spacecraft idling and low assembly efficiency due to the assembly constraints during the multibranch spacecraft cluster execution of on-orbit assembly task. First, multi-spacecraft assembly task planning model is established based on the assembly constraint relationship graph considering non-order-conserving assembly assumption scenario. Second, the assembly order forward index and homologation inertia index are proposed to constrain the problems of fragmentation and explosion of the number of subassemblies under the non-order-conserving assumption, as well as the problem of switching between different spacecrafts for successive assembly tasks. Finally, the topological sorting algorithm is improved based on depth-first search to solve the sequence allocation planning problem under the non-order-conserving constraints; the genetic algorithm is adopted for assembly sequence optimization, which effectively reduces the number of fragmented sub-assemblies and the number of consecutive task switches while improving the assembly efficiency; and the Gumbel-Sinkhorn network is used as the sequence allocation solution set for the assembly tasks, which realizes the mapping of a single assembly sequence to a feasible assembly solution set. The simulation calculation of on-orbit assembly task sequence allocation planning verifies the effectiveness of the model and method.

CLC number: V448.2 Document code: A Article ID: 1000-6893(2025)14-331258-17

References

【1】
【1】
 
 
Acta Aeronautica et Astronautica Sinica

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YUE C, ZHANG X, CAO X. Task planning for multi-spacecraft non-order-conserving parallel assembly. Acta Aeronautica et Astronautica Sinica, 2025, 46(14). https://doi.org/10.7527/S1000-6893.2024.31258

954

Views

22

Downloads

0

Crossref

0

Scopus

3

CSCD

Received: 24 September 2024
Revised: 04 November 2024
Accepted: 12 December 2024
Published: 18 December 2024
© 2025 The Journal of Acta Aeronautica et Astronautica Sinica