AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (6.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Mechanism analysis of horizontal well + CO2 huff and puff to improve the development effect in medium and low permeability heavy oil reservoirs——A case from Liu Guan-zhuang Chenglong 1601 Block in Dagang Oilfield as an example

Xiaoyan WANG1,2( )Xianzheng ZHAO1Lihong ZHOU1Dongping LI1Jie ZHANG1Huaxing ZHOU1Yang ZHANG1Haifeng WANG1Guochao XIA1Muguo TIAN1Yongtao ZHUANG1Dong WANG1
PetroChina Dagang Oilfield Company, Tianjin 300280, China
Laboratory of Enhanced Oil Recovery of Education Ministry, Northeast Petroleum University, Daqing 163318, China
Show Author Information

Abstract

Due to high oil viscosity, low permeability, thin reservoir formation, sand production, complex ground conditions, etc., Liu Guan-zhuang Chenglong 1601 Block in Dagang Oilfield, which is a heavy oil reservoir, cannot be developed effectively through conditional development technology. Therefore, horizontal well + CO2 huff and puff technology was proposed to solve this problem. And the experimental researches and the field test were conducted. Through laboratory experiments and numerical simulations, the mechanisms of enhanced oil recovery were studied and the injection-production parameters were optimized. The results showed that, after CO2 was dissolved in the heavy oil, the viscosity of the oil decreased from 16 800 mPa·s to 69 mPa·s, and the viscosity reduction rate was 99.6%; the threshold pressure gradient of the oil dropped from 19.1 MPa/m to 0.2 MPa/m. The absolute permeability increased by about 41.86%. Therefore, the heavy oil was more flowability. The optimal injected CO2 mass per unit length was between 3.5 and 5.5 t/m, the optimal CO2 injection rate per unit length was between 0.5 and 0.6 t/(m·d), the optimal shut in period was between 25 and 35 days, the optimal liquid production rate per day per unit length was between 0.075 and 0.125 m3/(m·d). Two kinds of integrated injection and production string, namely, the combination of oil pumping unit, hydraulic feedback pump and electric heating rod, hydraulic jet pump were employed. The horizontal well + CO2 huff and puff technology was carried out in field test, and significant technical and economic effects were achieved, which proved the reliability and practicality of this technology. A single round of CO2 huff and puff process obtained an oil increase of 1000~2000 tons, with the maximum oil increase of more than 4,000 tons. The oil production per mass CO2 was over 1.72 t/t. This technology provides a good reference for the economic exploration and development in the same type of oil reservoir.

References

【1】
【1】
 
 
Petroleum Science Bulletin
Pages 166-178

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
WANG X, ZHAO X, ZHOU L, et al. Mechanism analysis of horizontal well + CO2 huff and puff to improve the development effect in medium and low permeability heavy oil reservoirs——A case from Liu Guan-zhuang Chenglong 1601 Block in Dagang Oilfield as an example. Petroleum Science Bulletin, 2023, 8(2): 166-178. https://doi.org/10.3969/j.issn.2096-1693.2023.02.012

413

Views

2

Downloads

0

Crossref

8

Scopus

Received: 22 August 2021
Published: 01 April 2023
© 2023 Petroleum Science Bulletin