AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (9.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese | Open Access

Research and Application on Parameter Optimization of Medium-deep Hole Bench Blasting with Millisecond Delay in Open-pit Mines

Wei ZHANG1, Kai KANG1, Xin-min LI2, Qiang FU1, Li-peng WANG1, Gang HUANG3, Chun-yang ZHANG3, Bo-yang ZHANG3( )
Jinduicheng Molybdenum Co., Ltd., Huazhou District, Weinan 714102, China
Public Security Detachment of Weinan Public Security Bureau, Linwei District, Weinan 714000, China
School of Resources and Environmental Engineering, Wuhan University of Technology, Wuhan 430070, China
Show Author Information

Abstract

This study focuses on optimizing blasting parameters for millisecond blasting of medium-deep holes at the Jinduicheng Open-pit Molybdenum Mine, addressing its complex blasting conditions. Through numerical simulations, the research systematically examines how hole spacing, row spacing, and delay time influence blasting effectiveness. Field rock samples were prepared and tested to acquire actual in-situ rock mechanical parameters. Borehole acoustic data were analyzed using RSM acoustic logging software to determine rock wave impedance. A ten-segment detonation velocity meter measured explosive detonation velocity, enabling rock-explosive matching. Simulation parameters were established based on measured rock mechanical properties and explosive characteristics. LS-DYNA software was employed to construct numerical models with varying hole and row spacing, inter-hole and inter-row delay times.

CLC number: TD235.3 Document code: A Article ID: 1001-487X(2026)03-0054-10

References

【1】
【1】
 
 
BLASTING
Pages 54-63

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHANG W, KANG K, LI X-m, et al. Research and Application on Parameter Optimization of Medium-deep Hole Bench Blasting with Millisecond Delay in Open-pit Mines. BLASTING, 2026, 43(3): 54-63. https://doi.org/10.3963/j.issn.1001-487X.2026.03.006

9

Views

0

Downloads

0

Crossref

0

Scopus

Received: 12 January 2026
Published: 15 September 2026
© 2026 Blasting Magazine Editorial Office

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).