AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (12.4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese | Open Access

Research on Fracture Control Mechanism and Practical Validation for Blocking Length Optimization in Underground Vertical Deep-hole Blasting

Jun PAN1Zhi-hua LUO2( )Xiu-zhi SHI1Xian-yang QIU1Xiao-yuan LI3
School of Resources and Safety Engineering, Central South University, Changsha 410083, China
Shenzhen Zhongjin Lingnan Fankou Lead-zinc Mine Co., LTD., Shaoguan 512325, China
Guangxi Zhongjin Lingnan Mining Co., Ltd., Laibin 546100, China
Show Author Information

Abstract

Vertical deep hole underground blasting operations exhibit significant sensitivity to stemming length due to constrained free surface and singular energy release pathways, with this parameter critically influencing both explosive energy efficiency and fragmentation characteristics. This study investigates the impact of stemming length on vertical deep-hole blasting through theoretical analysis, scaled experiments, LS-DYNA simulations, and field validation, with theoretical results indicating that optimal stress-wave preservation occurs at a 5 cm stemming length when using a 5 cm burden distance. The experimental study employed concrete specimens with a constant burden distance of 5 cm and tested four distinct stemming configurations: 0 cm, 2 cm, 4 cm, and 5 cm. The results show that both the blasting crater radius and ejecta mass initially increased, then plateaued as the stemming length increased, achieving optimal performance at 5cm with a crater diameter of 7.9 cm, an ejecta mass of 207.96 g, and the most uniform fragmentation distribution. Field trials employing a 1.0 m stemming length after similarity ratio conversion demonstrated uniform fragmentation without cratering effects, thereby validating the 5 cm optimal length determination. These findings establish both theoretical foundations and practical guidelines for enhancing vertical deep-hole blasting performance in underground operations.

Article ID: 1001-487X(2026)02-0101-13

References

【1】
【1】
 
 
BLASTING
Pages 101-113

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
PAN J, LUO Z-h, SHI X-z, et al. Research on Fracture Control Mechanism and Practical Validation for Blocking Length Optimization in Underground Vertical Deep-hole Blasting. BLASTING, 2026, 43(2): 101-113. https://doi.org/10.3963/j.issn.1001-487X.2026.02.010

4

Views

0

Downloads

0

Crossref

0

Scopus

Received: 16 October 2025
Published: 19 November 2025
© 2026 Blasting Magazine Editorial Office

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).