AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (12 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese | Open Access

Blast-induced Crack Propagation Mechanism Between Tunnel Perimeter Holes Guiding Effect of Empty Holes

Xiao-ming YAN1Qian DONG2a,2b( )Man-ping DONG1Xiao-long XU2a,2bGuan-yong PAN1Jin-shan SUN2a,2bYing-kang YAO2a,2bDong WEI1
Hubei Communications Investment Construction Group Co., LTD., Wuhan 430070, China
State Key Laboratory of Precision Blasting, Jianghan University, Wuhan 430056 China
Hubei (Wuhan) Institute of Explosion Science and Blasting Technology, Jianghan University, Wuhan 430056 China
Show Author Information

Abstract

The quality of tunnel contour surfaces in drilling and blasting construction is fundamentally governed by the propagation efficiency and coalescence behavior of fractures generated between perimeter blast holes. This research employed physical modeling and computational analysis to investigate the influence of empty holes around a tunnel perimeter on the propagation law and coalescence effectiveness of cracks. Firstly, comparative model experiments were conducted to evaluate crack propagation and coalescence effectiveness between perimeter holes with and without relief-hole guidance, and to systematically analyze how blast-hole spacing (L) and the decoupling coefficient (K) affect these processes. Subsequently, numerical simulations were employed to study the stress wave propagation between holes under both configurations, thereby elucidating the fundamental mechanisms through which empty holes optimize fracture propagation paths and enhance coalescence effectiveness. Results indicate that effective crack coalescence between blast holes occurs under two parameter sets without empty hole guidance, K=2.0 with L=11D or K=1.25/1.5 with L=13D, where D denotes blast hole diameter. The empty hole guidance demonstrates optimal performance at K=1.5 and L=13D, producing a smoothly coalesced crack that aligns nearly perfectly with the inter-hole connecting line. The observed guiding phenomenon results from stress concentrations at the empty-hole walls, where superimposed reflected tensile waves and incident waves redirect fracture paths toward the inter-hole centerlines, thereby controlling crack propagation trajectories and coalescence patterns. Both experimental modeling and computational analysis revealed that the radius of the crack zone around the perimeter holes under empty-hole guidance was significantly smaller than under conventional blasting, demonstrating their dual functionality in simultaneously directing inter-hole crack coalescence while restricting undesirable radial fracture propagation.

CLC number: TD235.3 Document code: A Article ID: 1001-487X(2026)02-0014-12

References

【1】
【1】
 
 
BLASTING
Pages 14-25

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YAN X-m, DONG Q, DONG M-p, et al. Blast-induced Crack Propagation Mechanism Between Tunnel Perimeter Holes Guiding Effect of Empty Holes. BLASTING, 2026, 43(2): 14-25. https://doi.org/10.3963/j.issn.1001-487X.2026.02.002

5

Views

0

Downloads

0

Crossref

0

Scopus

Received: 11 September 2025
Published: 19 November 2025
© 2026 Blasting Magazine Editorial Office

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).