AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (9.4 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Vibration Response and Safety Control of Frame-shear Structure Adjacent to Mine Blasting

Yu-min YANG1, Mo-xi ZHAO1, Chuan-bo ZHOU1( ), Sheng ZHANG2, Guang-long HE2, Run-hua HAO3, Yu-qi ZHANG1
Faculty of Engineering, China University of Geosciences(Wuhan), Wuhan 430074, China
Inner Mongolia Shengli Zhongwei Blast Co., Ltd., Ordos 010300, China
Ordos Public Security Bureau Public Security Management Detachment Dangerous Management Brigade, Ordos 017001, China
Show Author Information

Abstract

The impact of blasting vibration on surrounding buildings has been widely concerned. Based on the deep hole bench blasting project of Changtan Open-pit Coal Mine, the characteristics of the adjacent 11-story frame-shear structure office building are comprehensively analyzed. After several blasting vibration tests, the distribution characteristics of vibration velocity and main frequency in different directions were analyzed. The significance of elevation difference on vibration velocity in various directions was obtained through single-factor analysis. Finally, based on the dimensional analysis method, a vibration velocity prediction model under the influence of multiple factors was studied, proposed, and applied to the blasting safety charge design. The main conclusions are as follows: with the increase of floors, the primary vibration direction changes from horizontal radial(X) to horizontal tangential(Y), and finally to vertical(Z). In most working conditions, the PPVx and PPVy are not more than 0.17 cm/s and 0.213 cm/s, respectively, and the elevation has little influence. The PPVz is concentrated in 0.05~0.41 cm/s, and the elevation amplification effect is significant in 7~11 layers. The maximum charge per delay, total charge amount, and horizontal distance are substantial for the three-axis PPVs. The elevation difference is not significant for the PPVx but significant for the PPVy and PPVz. The main vibration frequency is concentrated in 3~12 Hz, and some reach 16~30 Hz. Based on the vibration prediction model for the office building, combined with the blasting safety regulations and the blasting parameters under the most dangerous working conditions, the total charge of the bottom blasting should be within 10 267 kg, and the total charge of the deep hole bench blasting should be between 8268~8883 kg.

CLC number: TD235 Document code: A Article ID: 1001-487X(2025)01-0166-09

References

【1】
【1】
 
 
BLASTING
Pages 166-174

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YANG Y-m, ZHAO M-x, ZHOU C-b, et al. Vibration Response and Safety Control of Frame-shear Structure Adjacent to Mine Blasting. BLASTING, 2025, 42(1): 166-174. https://doi.org/10.3963/j.issn.1001-487X.2025.01.020

796

Views

25

Downloads

0

Crossref

1

Scopus

Received: 22 April 2024
Published: 20 June 2024
© 2025 Blasting Magazine Editorial Office