AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (9.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Study on Blasting Demolition Technology for Building with Oval Frame and Core Tube Structure

Zhi-yuan XIA1, Fan YANG1,2, Gang WANG3, Li-fei MA1, Ling YANG1, Huan CHEN1, Guo-an LUO1, Peng-fei GAO2,3( )
Anhui Jiangnan Blasting Engineering Co., Ltd., Xuancheng 242300, China
School of Civil Engineering and Architecture, Anhui University of Science and Technology, Huainan 232001, China
Anhui Jiangnan Chemical Co., Ltd., Hefei 230000, China
Show Author Information

Abstract

This study addresses the blasting demolition of an 18-story oval frame-core tube structure. Systematic analysis revealed that the structure′s small height-width ratio and long span contribute to potential instability and collapse, with uneven stress distribution due to irregular shear wall placement within the core tube. To mitigate these challenges, delayed blasting and auxiliary weakening techniques were employed. The approach included pre-treatments such as splitting and cutting to transform the cylindrical structure into a wall-like form, reducing deviation during collapse. The building was divided into four blasting zones with increasing delay times, particularly extending the delay for the last two zones by 1 second to ensure sequential support point failure and prevent incomplete collapse. Additionally, the upper and lower double-incision folding blasting method was utilized to control vibration upon ground impact and enhance overall dissociation. The demolition process, lasting approximately 5 seconds, resulted in the building collapsing primarily along the designed direction with minimal backseat movement and evident structural failures. The sequential floor folding and concentrated pile blasting demonstrated effective demolition.

CLC number: TU746.5 Document code: A Article ID: 1001-487X(2025)01-0116-09

References

【1】
【1】
 
 
BLASTING
Pages 116-124

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
XIA Z-y, YANG F, WANG G, et al. Study on Blasting Demolition Technology for Building with Oval Frame and Core Tube Structure. BLASTING, 2025, 42(1): 116-124. https://doi.org/10.3963/j.issn.1001-487X.2025.01.014

987

Views

32

Downloads

0

Crossref

0

Scopus

Received: 27 April 2024
Published: 20 June 2024
© 2025 Blasting Magazine Editorial Office