AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (2.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Research on Advanced Cutting Control Blasting of Complex Lithologic Tunnel

Zhi-long YANG1a,1b, Dong-wang ZHONG1a,1b( ), Wen-liang BAI2, Yun-peng ZHAO2, Jian-jun MA1a,1b, Teng-fei LI1a,1b, Li HE1a,1b, Jian-feng SI1a,1b,3, Lu-jun CAI1a,1b
College of Science, Wuhan University of Science and Technology, Wuhan 430065, China
Hubei Intelligent Blasting Engineering Technology Research Center, Wuhan University of Science and Technology, Wuhan 430065, China
China Railway Construction Bridge Engineering Bureau Group CO., LTD, Tianjin 300300, China
China Railway Siyuan Survey And Design Group Co., LTD., Wuhan 430065, China
Show Author Information

Abstract

In response to the poor excavation effect of traditional blasting in complex lithology tunnels, a method called advanced cutting control blasting is proposed based on the research of traditional smooth blasting and pre-splitting blasting. This method involves conducting the blasting around weak surrounding rock areas after tunnel contouring hole blasting. A quasi-three-dimensional model was established, and numerical simulations were conducted using the fluid-structure interaction(ALE) algorithm and ANSYS/LS-DYNA finite element analysis software to compare the advanced cutting control blasting method with traditional pre-splitting and smooth blasting methods. The results show that compared to smooth blasting and pre-splitting, advanced cutting control blasting reduced the depth of damage around the tunnel contour by 6.85% and 10.08%, respectively. Based on simulation results, field blast test plans were designed, and comparative tests between smooth surface blasting and advanced cutting control blasting methods were carried out. The blast results demonstrated that after adopting the advanced cutting control method, the tunnel contour had good shaping effects without block falling or collapse in weak surrounding rock areas, while over-excavation was effectively controlled. Three-dimensional cross-sectional scanning data and statistical results of post-blast sections indicated that compared to well-performing smooth surface blasting, maximum over-excavation decreased by 35.98%, average over-excavation decreased by 25.60%, concrete consumption decreased by 26.3%, and flatness standard deviation increased by 24.29%. This method has been verified through field practice as it reduces over-excavation while mitigating blast damage in complex lithology areas, thereby improving tunnel retaining rock flatness.

CLC number: TD235.3 Document code: A Article ID: 1001-487X(2024)02-0023-09

References

【1】
【1】
 
 
BLASTING
Pages 23-31

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
YANG Z-l, ZHONG D-w, BAI W-l, et al. Research on Advanced Cutting Control Blasting of Complex Lithologic Tunnel. BLASTING, 2024, 41(2): 23-31. https://doi.org/10.3963/j.issn.1001-487X.2024.02.004

569

Views

4

Downloads

0

Crossref

1

Scopus

Received: 28 January 2023
Published: 18 October 2023
© 2024 Blasting Magazine Editorial Office