AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (2.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Study on Influence of Charge Structure on Contour Forming Effect of Hard Rock Tunnel

Guang-hui ZHANG1, Jia-tuo ZHANG1, Yang WANG2( ), Yuan-long CHENG1, Hong-jie JANG2, Ming CHEN2
Luotian Pingyuan Pumped Storage Co., Ltd.of Hubei Energy Group, Huanggang 438000, China
School of Water Resources and Hydropower, Wuhan University, Wuhan 430072, China
Show Author Information

Abstract

The contour forming effect of a hard rock tunnel is of significant importance in enhancing the stability of surrounding rock and reducing support costs. This paper aims to optimize the single-hole charge and charge structure for tunnel contour holes. The theoretical range of charge parameters for blasting contour holes in tunnels is proposed initially. Subsequently, blasting tests were conducted on a hard rock tunnel using single-hole charges of 1200 g, 900 g, 750 g, and 600 g respectively, with all tunnel contours analyzed by a laser scanner. Finally, a fracture mechanics model was employed to simulate the contour blasting of the hard rock tunnel with different single-hole charges. The results indicate that when charging parameters are within a reasonable range, smaller single-hole charges result in fewer cracks between blasting holes and less damage to the surrounding rock. Although decreasing the charging amount from 1200 g to 600 g reduces over-excavation volume from 6.53 m3 to 2.02 m3, it also increases under-excavation volume caused by hole position error from 0.15 m3 to 0.26 m3 along the tunnel contour. Furthermore, compared to the damage mechanics model, the fracture mechanics model proves superior in simulating contour blasting for hard rock tunnels as evidenced by good agreement between calculated results and experimental data regarding half hole numbers on the tunnel's contour.

CLC number: U25 Document code: A Article ID: 1001-487X(2024)02-0015-08

References

【1】
【1】
 
 
BLASTING
Pages 15-22,169

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHANG G-h, ZHANG J-t, WANG Y, et al. Study on Influence of Charge Structure on Contour Forming Effect of Hard Rock Tunnel. BLASTING, 2024, 41(2): 15-22,169. https://doi.org/10.3963/j.issn.1001-487X.2024.02.003

480

Views

4

Downloads

0

Crossref

1

Scopus

Received: 06 July 2023
Published: 18 October 2023
© 2024 Blasting Magazine Editorial Office