AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (6.9 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Open-pit Blasting Technology Research on Super Deep Hole and Large Resistance Line

Yun-cheng CHEN( )Shou-dong XIEShi-liu YANTie-long LI
Hongda Blasting Engineering Group Co, Ltd, Guangzhou 510000, China
Show Author Information

Abstract

There was a special working face with an ultra-high bench and a large resistance at the 410 platform of a mine in Qingyuan city, which required one-time blasting. This working face had a bench height of 30m, a length of 80 m, and a face angle of 45°~80°. Due to the large bench height, small face angle, and the different face angles of the upper and lower parts, it was difficult to conduct the blasting construction. Before blasting design, the RTK measuring instrument and total station were used to measure the topography of the detailed working face, and then calculate the slope angle of each position of the face according to the topographic map. According to the rock properties, the construction experience and the drilling rig type, the powder factor and blast hole diameter were determined. Based on the above results, the toe burden, drilling angle, depth and spacing of the first row of blast holes were then deigned. Similarly, the burden, drilling angle, depth, spacing of the following rows of holes were also determined. After the hole parameters were determined, the charging structure was designed according to the burden of each row of holes, the rock volume of each hole, powder factor, and the principle of uniform blasting action. Finally, the initiation network was designed by the software of 3Dmine based on the direction of rock movement and the earthquake-proof requirements of the protected objects. During the construction process, the key links such as hole layout, hole depth measurement, drilling, charging, and network connection were strictly controlled, and positive results were obtained after blasting.

CLC number: TD235 Document code: A Article ID: 1001-487X(2023)01-0062-07

References

【1】
【1】
 
 
BLASTING
Pages 62-68

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
CHEN Y-c, XIE S-d, YAN S-l, et al. Open-pit Blasting Technology Research on Super Deep Hole and Large Resistance Line. BLASTING, 2023, 40(1): 62-68. https://doi.org/10.3963/j.issn.1001-487X.2023.01.009

403

Views

3

Downloads

0

Crossref

2

Scopus

Received: 19 September 2022
Published: 01 March 2023
© 2023 Blasting Magazine Editorial Office