AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home BLASTING Article
PDF (9.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast

Zhang-chao LI1, Shuai XU1( ), Jin-ping LI2, Xu-bo JI1,3
Key Laboratory of Ministry of Education for Safe Mining of Deep Metal Mines, Northeastern University, Shenyang 110819, China
Jiuquan Iron and Steel Group Co., Ltd., Jingtieshan Mining Co., Ltd., Jiayuguan 735100, China
Shandong Hengbang Smelting Co., Ltd., Yantai 264109, China
Show Author Information

Abstract

Since continuous charge structure is adopted in the bench blasting of Heigou open-pit mining area, the boulder yield is high and the secondary crushing workload is large, which seriously affects the operation efficiency of the mine's subsequent production and loading shovel loading process. In order to optimize the open-pit blasting charge structure, the 2DBench module for open-pit mining in the blasting simulation software JKSimBlast is used. Taking the length and the position of the commonly used air decking as the research objects and the boulder yield as the evaluation index, 25 groups of experiments with two factors and five levels are designed with the hole depth of 17.5 m and the charge length of 10 m. The simulation results show that with the same air deck length, the boulder yield decreases first and then increases with the deck position moving down, and thus there is an optimal deck position. With the same deck position, the boulder yield decreases first and then increases with the increase of the air deck length. Furthermore, the optimal air deck length is determined as 2 m and the optimal deck position is 11.5 m from the orifice. Finally, field industrial tests with the optimized structure are carried out in 5 different blasting areas. The blasting muck pile photos before and after optimization in area 3 is selected as the reference group. By comparison, the results show that the optimized charge structure reduces the boulder yield by an average of 9.24% and effectively improves the blasting effect, which provides a useful reference for the selection and optimization of the charge structure in open pit mines.

CLC number: TD235.3 Document code: A Article ID: 1001-487X(2023)01-0050-07

References

【1】
【1】
 
 
BLASTING
Pages 50-56,68

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
LI Z-c, XU S, LI J-p, et al. Optimization Research of Air Decking Charge Structure for Bench Blasting based on JKSimBlast. BLASTING, 2023, 40(1): 50-56,68. https://doi.org/10.3963/j.issn.1001-487X.2023.01.007

810

Views

12

Downloads

0

Crossref

0

Scopus

Received: 22 October 2022
Published: 01 March 2023
© 2023 Blasting Magazine Editorial Office