AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article | Open Access

An improved iterated greedy algorithm for scheduling distributed permutation flowshop problems with weighted total completion time criterion

Yuan-Zhen Li( )Lei-Lei MengBiao Zhang
School of Computer Science, Liaocheng University, Shandong Liaocheng, 252000, China
Show Author Information

Abstract

In this paper, distributed permutation flowshop problems with a weighted total completion time criterion (DPFSP-WTC) were addressed to minimize the completion time of all factories. First, the completion time of all factories were converted to a single one by a novel strategy, and a mixed integer programming model was developed. Second, an improved iterated greedy (IIG) algorithm was proposed. Based on features of the concerned problems, a simple heuristic is designed to improve the quality of initialization solutions. A local search operation was developed to improve the convergence performance of the proposed algorithm. Finally, numerous experiments were carried out for solving 720 instances with different scales. The proposed IIG was compared with five state-of-the-art algorithms. The comparisons and discussions showed that the proposed IIG has superior performance compared to its peers.

CLC number: 68T40, 68W20

References

【1】
【1】
 
 
AIMS Mathematics
Pages 28524-28555

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li Y-Z, Meng L-L, Zhang B. An improved iterated greedy algorithm for scheduling distributed permutation flowshop problems with weighted total completion time criterion. AIMS Mathematics, 2025, 10(12): 28524-28555. https://doi.org/10.3934/math.20251256

184

Views

1

Downloads

0

Crossref

0

Web of Science

0

Scopus

Received: 23 October 2025
Revised: 23 November 2025
Accepted: 26 November 2025
Published: 03 December 2025
©2025 the Author(s), licensee AIMS Press.

This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0)