Research Article | Open Access

Modified artificial fish swarm algorithm to solve unrelated parallel machine scheduling problem under fuzzy environment

Azhar Mahdi Ibadi1,2( )Rosshairy Abd Rahman1
School of Quantitative Sciences, Universiti Utara Malaysia, Sintok, Kedah 06010, Malaysia
Department of Physics, College of Science, University of Sumer, Al Rifaee, Thi-Qar 64005, Iraq
Show Author Information

Abstract

Unrelated parallel machine scheduling problem (UPMSP) in a fuzzy environment is an active research area due to the fuzzy nature of most real-world problems. UPMSP is an NP-hard problem; thus, finding optimal solutions is challenging, particularly when multiple objectives need to be considered. Hence, a metaheuristic algorithm based on a modified artificial fish swarm algorithm (AFSA) is presented in this study to minimize the multi-objective makespan and total tardiness. Three modifications were made to the proposed algorithm. First, aspiration behavior was added to AFSA behaviors to increase effectiveness. Second, improved parameters such as step and visual were used to balance global search capability and convergence rate. Finally, a transformation method was injected to make the algorithm suitable for discrete optimization problems such as UPMSP. The proposed algorithm was compared with AFSA and five modified versions of AFSA to verify and measure the algorithm's effectiveness by conducting three different sizes of problems. Afterward, the Wilcoxon signed-rank test was used to statistically evaluate the algorithm's performance. The results indicate that the proposed algorithm significantly outperformed the other algorithms, especially for medium and large-sized problems.

CLC number: 90C27, 90C70

References

【1】
【1】
 
 
AIMS Mathematics
Pages 35326-35354

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Ibadi AM, Rahman RA. Modified artificial fish swarm algorithm to solve unrelated parallel machine scheduling problem under fuzzy environment. AIMS Mathematics, 2024, 9(12): 35326-35354. https://doi.org/10.3934/math.20241679

78

Views

2

Downloads

1

Crossref

0

Web of Science

0

Scopus

Received: 07 July 2024
Revised: 29 November 2024
Accepted: 04 December 2024
Published: 15 December 2024
©2024 the Author(s), licensee AIMS Press.

This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0)