AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Quantitative analysis of water system pattern and connectivity changes in river network area after implementation of contour interception project in Donghai County

Zongzhi WANG1,2Anqi ZHANG1Kun WANG2( )Binglong YAN3Huihua DU2
College of Hydrology and Water Resources, Hohai University, Nanjing 210098, China
State Key Laboratory of Water Disaster Prevention, Nanjing Hydraulic Research Institute, Nanjing 210029, China
Lianyungang Water Conservancy Planning and Design Institute Co., Ltd., Lianyungang 222006, China
Show Author Information

Abstract

In order to quantitatively reveal the influence of the implementation of the contour interception project on water system structure and function in the river network area in Donghai County, taking the Longliang River-Shian River network area in Donghai County as the research object, a comprehensive analysis method of water system structure and connectivity at regional and nodal levels was proposed based on the analysis method of water system morphological structure, graph theory and landscape ecology method, and complex network method. The morphological structure and connectivity changes of the river network area water system before and after the implementation of the contour water interception project were calculated. The results showed that, in terms of water system structure, the number and length of rivers increased by 76.39% and 77.95%, respectively, after the implementation of the contour interception project; in terms of regional connectivity, the contour interception project connected isolated river networks laterally, increasing the water system circularity, node connection rate, and hydrological connectivity indexes of the regional water network by 101.29%, 37.27%, and 35.23%, respectively, and significantly improving the overall structural connectivity of the water system. The nodal function connectivity was significantly improved, and the spatial distributions of node propagation ability and node importance were optimized due to the bidirectional connection ability of the contour interception project.

CLC number: TV213.4 Document code: A Article ID: 1004-6933(2025)03-0031-08

References

【1】
【1】
 
 
Water Resources Protection
Pages 31-38

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
WANG Z, ZHANG A, WANG K, et al. Quantitative analysis of water system pattern and connectivity changes in river network area after implementation of contour interception project in Donghai County. Water Resources Protection, 2025, 41(3): 31-38. https://doi.org/10.3880/j.issn.1004-6933.2025.03.004

657

Views

22

Downloads

0

Crossref

0

Web of Science

5

Scopus

0

CSCD

Received: 15 December 2024
Published: 20 May 2025
© Journal of Water Resources Protection