AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Configuration optimization of construction machine group for hydraulic tunnel under carbon emission constraint

Chunling JIN1, Yang SU1( ), Li GONG1, Jingjing LIU1, Jianzhou WEI2
School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070, China
China Railway 8 Bureau Group Kunming Railway Construction Co., Ltd., Kunming 650200, China
Show Author Information

Abstract

A multi-objective optimization function based on the schedule-cost-quality-carbon emission is constructed according to the improvement path of optimization of hydraulic tunnel construction machine fleet and carbon emission reduction under the constraint of carbon emission. A particle swarm optimization (PSO) after the improvement of simulated annealing (SA) is selected and the carbon emission per working unit of construction machines is calculated with the reference to the construction machine-working cost quota and IPCC guidelines. By incorporating the new mechanical configuration into carbon emission factors, an evaluation system with duration, cost, quality and carbon emission as the primary indicators and 14 secondary indicators is established and the optimization model of fleet configuration considering carbon emissions is built. The optimization of construction machine fleet configuration under multi-objective constraints was carried out in the No. 3 branch of Wanjia tunnel of the Dianzhong water diversion project. The results show that the established target preference weight evaluation system of hydraulic tunnel construction fleet configuration can comprehensively consider the impact of construction fleets on the environment. The main carbon emission sources of the construction machine fleet are tunnel multifunctional work cart and concrete mixing plant, and the carbon emission(CO2) reaches 1000kg/machine working unit. The improved particle algorithm can effectively enhance the search capability of global optimization and identify the key risk sources of carbon emission in the construction machinery. Finally, the model optimization results are consistent with the on-site construction situation, which verifies the feasibility of the model.

CLC number: TV672.1;X511 Document code: A Article ID: 1000-1980(2023)03-0084-07

References

【1】
【1】
 
 
Journal of Hohai University (Natural Sciences)
Pages 84-90

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
JIN C, SU Y, GONG L, et al. Configuration optimization of construction machine group for hydraulic tunnel under carbon emission constraint. Journal of Hohai University (Natural Sciences), 2023, 51(3): 84-90. https://doi.org/10.3876/j.issn.1000-1980.2023.03.011

494

Views

7

Downloads

0

Crossref

0

Scopus

6

CSCD

Received: 29 May 2022
Published: 25 May 2023
© 2023 Journal of Hohai University (Natural Sciences)