AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (5.3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Publishing Language: Chinese

Research status and main problems of artificial island construction in underwater tunnel

Wei ZHU1,2, Lu WANG3,4( ), Yongjin QIAN3,4, Zhongqiang FANG1,5, Kaijun LU3,4, Bin WEI3,4, Lifu MENG3,4
China Design Group Co., Ltd., Nanjing 210014, China
Institute of Water Science and Technology, Hohai University, Nanjing 210098, China
Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, China
College of Civil and Transportation Engineering, Hohai University, Nanjing 210098, China
Research and Development Center of Transport Industry of Technologies and Equipments for Intelligent Design, Construction and Maintenance of Underwater Tunnel, Nanjing 210014, China
Show Author Information

Abstract

In view of the research status and main problems of artificial island construction in the underwater tunnel engineering, this study collects typical engineering cases of artificial island in the underwater tunnel projects, and summarizes key construction technologies of foundation treatment, cofferdam construction and fill reinforcement of artificial islands. Two main problems in the construction process of underwater tunnel artificial islands were proposed: firstly, the combination of schemes and process optimization for the soft foundation treatment and the soil filling reinforcement; secondly, the utilization rate of dredged soil in the construction of artificial islands in China was relatively low. Based on the existing construction technology of artificial islands, the future development direction of artificial island construction is to achieve the green and rapid island building through prefabricated artificial island components.

CLC number: P752 Document code: A Article ID: 1000-1980(2023)03-0072-12

References

【1】
【1】
 
 
Journal of Hohai University (Natural Sciences)
Pages 72-83

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHU W, WANG L, QIAN Y, et al. Research status and main problems of artificial island construction in underwater tunnel. Journal of Hohai University (Natural Sciences), 2023, 51(3): 72-83. https://doi.org/10.3876/j.issn.1000-1980.2023.03.010

838

Views

5

Downloads

0

Crossref

0

Scopus

2

CSCD

Received: 21 March 2022
Published: 25 May 2023
© 2023 Journal of Hohai University (Natural Sciences)