AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (990.9 KB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Article | Open Access

A Q-Learning-Assisted Co-Evolutionary Algorithm for Distributed Assembly Flexible Job Shop Scheduling Problems

Song GaoShixin Liu( )
College of Information Science and Engineering, Northeastern University, Shenyang, 110819, China
Show Author Information

Abstract

With the development of economic globalization, distributed manufacturing is becoming more and more prevalent. Recently, integrated scheduling of distributed production and assembly has captured much concern. This research studies a distributed flexible job shop scheduling problem with assembly operations. Firstly, a mixed integer programming model is formulated to minimize the maximum completion time. Secondly, a Q-learning-assisted co-evolutionary algorithm is presented to solve the model: (1) Multiple populations are developed to seek required decisions simultaneously; (2) An encoding and decoding method based on problem features is applied to represent individuals; (3) A hybrid approach of heuristic rules and random methods is employed to acquire a high-quality population; (4) Three evolutionary strategies having crossover and mutation methods are adopted to enhance exploration capabilities; (5) Three neighborhood structures based on problem features are constructed, and a Q-learning-based iterative local search method is devised to improve exploitation abilities. The Q-learning approach is applied to intelligently select better neighborhood structures. Finally, a group of instances is constructed to perform comparison experiments. The effectiveness of the Q-learning approach is verified by comparing the developed algorithm with its variant without the Q-learning method. Three renowned meta-heuristic algorithms are used in comparison with the developed algorithm. The comparison results demonstrate that the designed method exhibits better performance in coping with the formulated problem.

References

【1】
【1】
 
 
Computers, Materials & Continua
Pages 5623-5641

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Gao S, Liu S. A Q-Learning-Assisted Co-Evolutionary Algorithm for Distributed Assembly Flexible Job Shop Scheduling Problems. Computers, Materials & Continua, 2025, 83(3): 5623-5641. https://doi.org/10.32604/cmc.2025.058334

410

Views

9

Downloads

2

Crossref

1

Web of Science

2

Scopus

Received: 10 September 2024
Accepted: 11 March 2025
Published: 19 May 2025
© The Author 2025.

This work is licensed under a Creative Commons Attribution 4.0 International License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.