AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article | Open Access

On-Line Scheduling with A Non-Renewable Resource Under Periodic Supply

School of Mathematics and Statistics, Zhengzhou University, Zhengzhou 450001, China
School of Mathematics and Statistics, Henan University of Technology, Zhengzhou 450001, China
Show Author Information

Abstract

This is the first paper to address an on-line scheduling problem with a non-renewable resource. Resource is supplied with known quantity periodically. The jobs arriving on-line over time have the same basic processing time and the same required quantity of resource. Each job is revealed until its release time, and a scheduler makes decision without the information of future jobs. If the available quantity of the resource satisfies the resource requirement, a job is processed with the basic processing time by consuming the resource requirement. Otherwise, the job can be processed with deterioration under a longer processing time by consuming the insufficient resource quantity. The objective is to minimize the makespan. For this problem on a single machine, we derive a lower bound on the competitive ratio by adversary strategy, and provide a best possible on-line algorithm with a competitive ratio of 1+α, where α is the positive root of α2+3α=1.

References

【1】
【1】
 
 
Tsinghua Science and Technology
Pages 285-299

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang L, Li W, Lin R, et al. On-Line Scheduling with A Non-Renewable Resource Under Periodic Supply. Tsinghua Science and Technology, 2027, 32(1): 285-299. https://doi.org/10.26599/TST.2024.9010221

823

Views

67

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 13 July 2024
Revised: 12 October 2024
Accepted: 04 November 2024
Published: 11 September 2026
© The author(s) 2027.

The articles published in this open access journal are distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/).