AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (1.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Minimum-Cost Forest for Uncertain Multicast with Delay Constraints

Bangbang RenGeyao Cheng( )Deke Guo
College of Systems Engineering, National University of Denfense Technology, Changsha 410072, China.
Show Author Information

Abstract

The use of multicast transmission can efficiently reduce the consumption of network resources by jointly serving multiple destinations with a single source node. Currently, many multicast applications impose the constraint wherein multicast flows must be processed by a series of Virtual Network Functions (VNFs) before reaching their destinations. Given a multicast transmission, there are usually multiple server nodes, each of which is able to host all the required VNFs. Thus, the multicast flow should be initially steered to one or a few selected server nodes that act as pseudo sources, and the destinations will then retrieve new flow from any of these pseudo sources. In this paper, we model this kind of multicast as an uncertain multicast with multiple pseudo sources, whose routing structure is usually a forest consisting of multiple isolated trees. We then characterize and construct the Delay-guaranteed Minimum Cost Forest (D-MCF) such that each path from the source to the destination satisfies the end-to-end delay constraint. To tackle this NP-hard problem, we design two efficient methods, the Partition Algorithm (PA) and the Combination Algorithm (CA), to approximate the optimal solution. Theoretical analyses and evaluations indicate that these two methods can generate the desired routing forest for any multicast transfer. Moreover, the PA method achieves a better balance between performance and time consumption than the CA method. The evaluation results show that PA- (Ω+20) can reduce total cost by 49.02% while consuming 12.59% more time, thus significantly outperforming the CA- (Ω+20) method.

References

【1】
【1】
 
 
Tsinghua Science and Technology
Pages 147-159

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Ren B, Cheng G, Guo D. Minimum-Cost Forest for Uncertain Multicast with Delay Constraints. Tsinghua Science and Technology, 2019, 24(2): 147-159. https://doi.org/10.26599/TST.2018.9010072

911

Views

36

Downloads

5

Crossref

N/A

Web of Science

6

Scopus

0

CSCD

Received: 13 May 2017
Accepted: 18 May 2017
Published: 31 December 2018
© The author(s) 2019