AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (43.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Long sequence time series model to predict uplift of segmental lining in shield tunnel based on LightGBM-Informer

Jia-jie ZHENFeng-wen LAIMing HUANG( )Shuang LIKai XU
College of Civil Engineering, Fuzhou University, Fuzhou, Fujian 350108, China
Show Author Information

Abstract

Utilizing machine learning to predict the uplift of shield tunnel linings ahead of the cutterhead during construction enables timely adjustments of control parameters, mitigating lining uplift issues. Nevertheless, existing models exhibit limited performance in long sequence time-series forecasting (LSTF) and face challenges in accurately predicting the uplift of multiple lining rings ahead of the shield cutterhead. Considering the impact of shield control, attitude parameters, and geological condition, and utilizing the Boruta algorithm to determine model input features, a shield tunnel segment uplift prediction model based on LightGBM-Informer was proposed. This model incorporates a wavelet transform filter and a complete ensemble empirical mode decomposition with adaptive noise (CEEMDAN) method to eliminate noise in time series data. The accuracy and applicability of the proposed model were validated using the monitoring data from subway shield tunnel projects in Nanjing and Xiamen. The results demonstrate that the model exhibits enhanced prediction accuracy in comparison to other models, including recurrent neural network (RNN), long short-term memory (LSTM), gated recurrent unit (GRU), and Transformer. Additionally, it demonstrates robust generalization capabilities across diverse geological condition datasets. As the length of the prediction sequence increases, the performance advantages of the model become more pronounced, accurately predicting the uplift of 1−2 rings of linings ahead of the shield cutterhead. Feature importance analysis based on Shapley additive explanations (SHAP) method indicates that earth chamber pressure and vertical displacement at the shield head and tail have significant impacts on lining uplift. The model provides theoretical guidance for intelligent control of shield tunnel lining construction in complex, water-rich environments.

References

【1】
【1】
 
 
Rock and Soil Mechanics
Pages 3791-3801

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
ZHEN J-j, LAI F-w, HUANG M, et al. Long sequence time series model to predict uplift of segmental lining in shield tunnel based on LightGBM-Informer. Rock and Soil Mechanics, 2024, 45(12): 3791-3801. https://doi.org/10.26599/RSM.2024.9435256

880

Views

40

Downloads

0

Crossref

0

Web of Science

0

Scopus

0

CSCD

Received: 04 March 2024
Accepted: 25 April 2024
Published: 26 August 2025
© 2024 Rock and Soil Mechanics