AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline

Feasibility Analysis on Resuming Flow of Large Karst Spring in Heilongdong

Xi-qing BAI1( ), Yan LIU2
Hydrological Geology, Engineering Geology and Environmental Geology Exploration Institute, China National Administration of Coal Geology, Handan, Hebei, China, 056004
No.11 Geology Group, Hebei Provincial Bureau of Geology and Mineral Resources, China, 054000
Show Author Information

Abstract

Based on discussion about the features of karst groundwater resources distribution of karst water system in Heilongdong Springs and causes of spring groups cutoff and according to current karst groundwater resources and exploitation distribution conditions of coal resources, this paper put forward the measures for protecting groundwater resources, i.e. intensifying plugging of underground coal mine gushing water points, grouting in advance to reinforce the small faults and weak lower confining bed of coal seam and leave sufficient waterproof coal pillars based on adjustment of the water sources for centralized water supply and water supplying and draining and countermeasures of improving use ratio of mine water and replacement of direct exploitation to realize resuming flow of spring groups and sustainable development of groundwater resources and exploitation of coal resources.

References

【1】
【1】
 
 
Journal of Groundwater Science and Engineering
Pages 80-87

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
BAI X-q, LIU Y. Feasibility Analysis on Resuming Flow of Large Karst Spring in Heilongdong. Journal of Groundwater Science and Engineering, 2014, 2(2): 80-87. https://doi.org/10.26599/JGSE.2014.9280022

856

Views

36

Downloads

5

Crossref

N/A

Web of Science

0

Scopus

Published: 28 June 2014
© 2014 Journal of Groundwater Science and Engineering Editorial Office