Abstract
A three-dimension flow model based on the hydrogeological conditions within the influent zone of the Yellow River in Henan Province, Yuanyang, China, was set up using FEFLOW. The interaction of the Yellow River and the groundwater was simulated under various pumping scenarios. For the planned water supply area, simulation results indicate that, within 10 years’ pumping at a rate of 4.86×108 m3/a, the shallow groundwater flow and infiltration from Yellow River will be stabilized. After 10 years pumping, the infiltration will increase to 3.22×108 m3/a and take approximately 70% of the pumping water.
京公网安备11010802044758号
Comments on this article