AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
Home Hydrosphere Article
PDF (1.3 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article | Open Access

Reconstructing flood escalation and the timing of protective actions in underground transport from public evidence [version 1]

Guangye Chen1,3, Tongliang Gong1,2,3( ), Yangzong Cidan 1,3, Zexi Su1,3, Lei Li1,3, Lin Zeng1,3
College of Water Conservancy and Civil Engineering, Xizang Agriculture and Animal Husbandry University, Linzhi 860000, China
Key Laboratory of Glacial Lake Outburst Floods and Water Resources, Xizang Autonomous Region, Lhasa 850000, China
Yarlung Zangbo Grand Canyon Water Cycle Monitoring and Research Station, Linzhi 860000, China
Show Author Information

Abstract

Flood-response evaluations compare times that may represent different water states, action roles or completion stages. We examined how these distinctions change the timing judgments supported by public evidence for four floods affecting five underground transport facilities in Zhengzhou, Guangzhou, Singapore and Osong. Official accounts were decomposed into source-linked propositions retaining facility scope, action status, temporal bounds and narrative order. We tested reference substitution, point assignment to uncertain records, recovery endpoints and publication differences. Zhengzhou's tunnel closure occurred approximately 76 min after a reported depth criterion but 74 min before submergence, measuring different stages of escalation. Osong's approximately 120 min from a control criterion to full inundation could not represent a response duration because traffic control was explicitly not implemented. Guangzhou's suspension window extended from 3 min before to 4 min after plan activation, leaving strict order unresolved. Singapore's records distinguished clearance from restored service and contained a 14 min difference between restoration claims. Preserving source meaning changed the quantity measured, identifiable order and precision. The reconstruction identifies which comparisons public flood records support and which additional observations are needed to evaluate completed protection.

References

【1】
【1】
 
 
Hydrosphere
Article number: 9380014-V1

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Chen G, Gong T, YC, et al. Reconstructing flood escalation and the timing of protective actions in underground transport from public evidence [version 1]. Hydrosphere, 2026, https://doi.org/10.26599/HYD.2026.9380014.V1

9

Views

0

Downloads

0

Crossref

Version 1: 27 November 2026
© 2026 The Author(s).

This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).