AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (7.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Research Article | Open Access

Feasibility framework for jointless bridge adoption across Nepal’s physiographic regions

Arun Paudel1, Mishan Karki1, Kushal Karki1( ), Kabin Lamichhane1, Garima Gauli1, Bijaya Jaishi2, Baochun Chen3, Fuyun Huang3
Department of Civil Engineering, Pulchowk Campus, Institute of Engineering, Tribhuvan University, Lalitpur, Bagmati 44600, Nepal
Department of Road, Ministry of Infrastructure Development, Kathmandu, Bagmati 44600, Nepal
School of Civil Engineering, Fuzhou University, Fuzhou, Fujian 350108, China
Show Author Information

Abstract

Expansion joints remain a persistent source of deterioration, high maintenance costs, and seismic vulnerability in Nepal’s rapidly expanding bridge network. This study examines the status, feasibility, and adoption potential of jointless bridges across Nepal’s diverse physiography, combining a review of international design practices with a case study of two fully integral abutment bridges under construction on the Gorusinghe-Chanauta section in Kapilbastu district. Structural configuration, foundation and subsoil conditions, and seismic design parameters were compiled from Detailed Project Report documents and cross-verified against structural drawings; as-built cost data were unavailable, so a quantitative comparison with conventional bridges is left for follow-up work. The case study grounds findings empirically only for the Terai region, while recommendations for the remaining zones—Siwalik, Middle Hills, Higher Himalaya, and Trans-Himalaya draw on international literature and require site-specific validation. A physiographic feasibility framework links soil conditions and seismic hazard to indicative span ranges and bridge types: fully integral abutments suit short-to-medium spans on stiff soils or rock in hill and mountain regions, while semi-integral configurations suit liquefiable Terai–Siwalik deposits, given granular backfill and adequate pile penetration. Modelled soil-structure interaction can help such bridges reduce maintenance burdens and improve seismic performance, underscoring the need for Nepal-specific guidelines and further study.

References

【1】
【1】
 
 
Journal of Highway and Transportation Research and Development (English Edition)
Pages 10-20

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Paudel A, Karki M, Karki K, et al. Feasibility framework for jointless bridge adoption across Nepal’s physiographic regions. Journal of Highway and Transportation Research and Development (English Edition), 2026, 20(3): 10-20. https://doi.org/10.26599/HTRD.2026.9480107

325

Views

40

Downloads

0

Crossref

Received: 01 August 2026
Revised: 10 September 2026
Accepted: 18 September 2026
Published: 30 September 2026
© The Author(s) 2026. Published by Tsinghua University Press.

This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).