AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.5 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications

Institute of Modern Agricultural Equipment, Xihua University, Chengdu 610039, China
Show Author Information

Abstract

Optimizing the scheduling of farm machinery is essential to meet farmers’ requirements, minimize scheduling costs, and save time. This study focuses on scheduling farm machinery in multiple cooperatives across various regions, aiming to minimize scheduling costs and reduce scheduling time. Initially, a multi-constraint hybrid clustering algorithm is employed to assign farmland to each farm machinery cooperative by clustering before scheduling. Subsequently, an enhanced version of the Non-dominated Sorting Genetic Algorithm-Ⅱ (NSGA-Ⅱ) is proposed, integrating a local search strategy based on congestion-based neighborhood search and the Simulated Annealing (SA) algorithm to develop the NSGA-Ⅱ-SA algorithm. This hybrid multi-objective evolutionary algorithm effectively optimizes scheduling costs and time. The model’s validity and the algorithm’s superiority are demonstrated through a Web-based multi-region agricultural machine scheduling system and an example study. Experimental results show that the NSGA-Ⅱ-SA algorithm significantly reduces scheduling costs and time, as well as the number of scheduled farm machines, outperforming other algorithms with reductions of 9.8%, 3.1%, and 8.7% in total scheduling costs, and 12.5%, 13.4%, and 11.6% in total scheduling time. This research establishes a theoretical framework for multi-region agricultural machine scheduling in hilly and mountainous areas, enhancing agricultural production efficiency.

References

【1】
【1】
 
 
International Journal of Agricultural and Biological Engineering
Pages 234-245

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Liu H, Luo J, Zhang L, et al. Optimal scheduling of agricultural machines in hilly mountainous areas based on NSGA-Ⅱ-SA hybrid algorithm with applications. International Journal of Agricultural and Biological Engineering, 2025, 18(5): 234-245. https://doi.org/10.25165/j.ijabe.20251805.9106

2

Views

0

Downloads

0

Crossref

0

Web of Science

0

Scopus

Received: 29 May 2024
Accepted: 26 May 2025
Published: 31 October 2025
© The Author(s) 2025

We adopt the latest version of license CC BY 4.0, https://creativecommons.org/licenses/by/4.0/