AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (9.7 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Influence of Multi-Structure Foundation on Evolution Law of Leakage Dissolution of Cutoff Wall

Lei Gan1,2( ), Yuan Liu1, Zhenzhong Shen1,2, Liqun Xu1
College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, P. R China
State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Hohai University, Nanjing 210098, P. R China
Show Author Information

Abstract

The change of permeability and thickness of deep overburden foundation would affect the seepage field of dam foundation, and then change the erosion evolution process of cutoff wall in dam foundation. In order to study the influence mechanism of multi-structure foundation change on leakage dissolution of cutoff wall, a coupling analysis model of seepage and corrosion of concrete cutoff wall in overburden foundation was proposed by combining fluid mechanics theory, chemical dynamics theory and convection-diffusion equation. The effects of thickness and permeability coefficient of strong permeable layer, weak permeable layer and third permeable layer on calcium ion concentration, porosity and seepage characteristics of cutoff wall were presented. The results show that, with the increase of service years, the calcium ion concentration of the cutoff wall increases rapidly to the peak at first, and then decreases continuously. The porosity and permeability coefficient increase exponentially, and the total seepage flow of the dam increases continuously. Among the influencing factors, the permeability coefficient of weak permeable layer has the greatest influence on the calcium ion concentration, porosity and total seepage flow of the cutoff wall, followed by the thickness and permeability coefficient of strong permeable layer. The service life of concrete cutoff wall under various conditions is from 38.46 a to 44.00 a. The research results can provide theoretical basis for the long-term service performance evaluation of earth-rock dams on multi-structure foundation with deep overburden.

CLC number: TU452 Document code: A Article ID: 1673-0836(2024)01-0287-15

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 287-301

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Gan L, Liu Y, Shen Z, et al. Influence of Multi-Structure Foundation on Evolution Law of Leakage Dissolution of Cutoff Wall. Chinese Journal of Underground Space and Engineering, 2024, 20(1): 287-301. https://doi.org/10.20174/j.juse.2024.01.030

480

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 29 May 2023
Published: 01 February 2024
© 2024 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).