AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (7.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Application and Research Progress of Prefabricated Assembly Technology in Underground Engineering

Ke Cao1, Yuchen Wan1, Xiaohan Zhou2( )
College of Management Science and Real Estate, Chongqing University, Chongqing 400031, P. R. China
College of Civil Engineering, Chongqing University, Chongqing 400031, P. R. China
Show Author Information

Abstract

In the context of the China’s vigorous promotion of construction industrialization, prefabricated assembly construction technology has received extensive attention and development. Compared with a large number of research and application of above-ground buildings, the application and development of prefabricated assembly construction technology in underground space still has great potential. At first, the Citespace software is used to visually analyze the literature related to underground assembly from 2000 to 2022. Then, taking three typical underground space buildings of underground comprehensive pipe gallery, subway station and tunnel as examples, and the research and application status of prefabricated construction technology in underground engineering in China are summerized. Five key research contents of prefabricated construction of underground engineering are proposed, including the assembly technology of prefabricated lining, the mechanical performance of prefabricated structures, the connection joints of prefabricated components, the seismic performance of prefabricated structures, and the waterproof performance of prefabricated structures. Finally, five research trends of prefabricated structures in underground spaces are summarized to provide references for the popularization and application of prefabricated technology in underground engineering.

CLC number: TU93 Document code: A Article ID: 1673-0836(2023)06-2055-17

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 2055-2071

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Cao K, Wan Y, Zhou X. Application and Research Progress of Prefabricated Assembly Technology in Underground Engineering. Chinese Journal of Underground Space and Engineering, 2023, 19(6): 2055-2071. https://doi.org/10.20174/j.juse.2023.06.032

928

Views

4

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 08 February 2023
Published: 01 December 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).