AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (2.9 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Calculation Method of Horizontal Displacement of Diaphragm Wall in Deep Foundation Pit during Internal Support Removal

Tao Li1( ), Yanlong Wang1, Yiwei Yang1, Yuqi Zhou2, Bo Liu1
School of Mechanics and Civil Engineering, China University of Mining and Technology (Beijing), Beijing 100083, P. R. China
China Construction First Group, Construction & Development Co., Ltd., Beijing 100102, P. R. China
Show Author Information

Abstract

The maximum horizontal displacement of underground diaphragm wall of deep foundation pit usually occurs in the internal support removal stage. Based on the superposition principle of elastic deformation, the horizontal displacement increment of the diaphragm wall is considered as the superposition of free deformation and compensation deformation. The contact point between the bottom plate and the diaphragm wall is considered as the fixed end. Then the variation rule of the horizontal displacement of the diaphragm wall is obtained by the limit equilibrium method. Finally, the horizontal displacement increments of the underground diaphragm wall at different stages of dismantling the bracing are calculated and analyzed against the background of two examples of deep foundation pit projects——the deep foundation pit engineering of "underground continuous wall + steel bracing" in Sanyuan Bridge station of Beijing Metro Line 12 and "underground continuous wall + reinforced concrete internal bracing" in Xiaguangli, Chaoyang District, Beijing. The results show that: The horizontal displacement curve of the diaphragm wall obtained by the established method is in good agreement with the measured curve. The horizontal displacement increment of the diaphragm wall is 2~5 times larger than that of the bottom. The maximum horizontal displacement of the diaphragm wall moves up in the process of bracing removal, with an upward displacement of about 0.15H ~ 0.2H. The results can provide important theoretical reference for similar projects.

CLC number: TU47 Document code: A Article ID: 1673-0836(2023)06-1992-12

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1992-2003

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li T, Wang Y, Yang Y, et al. Calculation Method of Horizontal Displacement of Diaphragm Wall in Deep Foundation Pit during Internal Support Removal. Chinese Journal of Underground Space and Engineering, 2023, 19(6): 1992-2003. https://doi.org/10.20174/j.juse.2023.06.025

545

Views

4

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 11 March 2023
Published: 01 December 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).