AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (9.8 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Effect of Excavation Sequence on Surface Settlement and Segment Deformation of Treble-Hole Shield Tunnel

You Wang1( ), Xiaowei Zhao2, Fang Dai1, Ming Zhong3, Heng Zhang4
School of Civil Engineering, Central South University, Changsha 410075, P. R. China
Power China, Zhongnan engineering Co., Ltd., Changsha 410021, P. R. China
China Railway (Shanghai) Investment Group Co., Ltd., Shanghai 200126, P. R. China
China Railway ERJU 5th Engineering Co., Ltd., Chengdu 610091, P. R. China
Show Author Information

Abstract

In order to investigate the influence of excavation sequence of three-line parallel shield tunnel on ground surface settlement and segment deformation, teking the tunnel construction of Nantong Metro Line 1 as the engineering background, FLAC3D software is used to simulate the tunneling process of three-line parallel shield tunnel under three cases of "right-center-left", "center-right-left" and "left-right-center", and the deformation pattern of the ground surface and shield segment is analysed. For the ground surface deformation, it is found that the width of the settlement trough is basically the same, but there are differences in the maximum surface settlement values. The order of surface subsidence caused by the three cases is as follows: Case 2 > Case 1≈ Case 3. For the segment deformation, the tunnel deformation is changed from a standard circle to an ellipse with flat top and bottom and wide ends, but there are differences in the offset process and the final segment convergence value. The segment deformation of the antecedent tunnel caused by the three case is arranged in descending order: Case 3 > Case 2 ≈ Case 1. Numerical simulation results show that when the "right-center-left" construction sequence is used, the maximum ground surface settlement and segment deformation is smaller, which can effectively guarantee the safety of tunnel construction. It is recommended to choose this excavation sequence in the actual construction process. The maximum settlement value obtained from the simulation was - 11.8 mm, and the maximum settlement value predicted by the Peck formula was - 11.1 mm, with errors of 1.46% and 4.78%, respectively, compared with the maximum settlement value of -11.63 mm obtained by fitting the measured fitting data.

CLC number: U455.43 Document code: A Article ID: 1673-0836(2023)05-1665-13

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 1665-1677

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Wang Y, Zhao X, Dai F, et al. Effect of Excavation Sequence on Surface Settlement and Segment Deformation of Treble-Hole Shield Tunnel. Chinese Journal of Underground Space and Engineering, 2023, 19(5): 1665-1677. https://doi.org/10.20174/j.juse.2023.05.028

388

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 19 January 2023
Published: 01 October 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).