AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (10 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Application Research of BIM in the Whole Life Cycle of Highway Mountain Tunnel

Dehong Li1( ), Xiang Zhou2, Xiaotong Huang1, Dapeng Tian1, Weirui Li1
China Railway Construction Yunnan Inverstment Co., Ltd., Kunming 650000, P. R. China
School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, P. R. China
Show Author Information

Abstract

Based on the Yanglin Tunnel of Kunming Expressway in Yunnan Province, combined with BIM technology, the research of tunnel parametric modeling, construction information management and BIM model and numerical model interaction method was carried out. Using Autodesk Revit software platform and based on Dynamo visual programming technology, a series of node packages for parametric modeling of highway mountain tunnel were developed, which effectively created tunnel route model, tunnel lining model, tunnel support model and geological model. Automatic procedures were developed for parameter information creation and input, and mass import of tunnel engineering data into BIM model was realized. The model interaction between Revit and Midas GTS NX was also realized based on the intermediate format file ". sat", and the model in the modeling section was simulated and fed back to the model. The research results can provide technical reference for the application of BIM technology in the design, construction, operation and maintenance of the whole life cycle of highway mountain tunnel and other underground belt projects.

CLC number: U456.32 Document code: A Article ID: 1673-0836(2023)03-0981-11

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 981-991

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Li D, Zhou X, Huang X, et al. Application Research of BIM in the Whole Life Cycle of Highway Mountain Tunnel. Chinese Journal of Underground Space and Engineering, 2023, 19(3): 981-991. https://doi.org/10.20174/j.juse.2023.03.028

548

Views

3

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 08 November 2022
Published: 01 June 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).