AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.1 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Study on Optimization of Structure Parameters for Long Tunnel with Air Bin Ventilation System

Shuai Yang1( ), Rui Ren1, Tingchuan Wang1, Yaqiong Wang1,2
School of Highway, Chang’an University, Xi’an 710064, P. R. China
Department of Civil and Environmental Engineering, Virginia Polytechnic Institute and State University, Blacksburg 24061, Virginia, USA
Show Author Information

Abstract

To solve the problem that the blind heading distance was limited by the length of the air duct, taking Funiu Mountain extra-long highway tunnel as the engineering background, the structural parameters of the air bin were studied by numerical simulation. Taking the ventilation efficiency of the axial flow fan in the air bin as the evaluation standard, the optimization parameters of the air bin structure were obtained, and its overall ventilation effect was evaluated. The results show that the reasonable length-width ratio of the air bin is 1∶2; the spacing between two axial fans is 2-4 m. When the air demand difference between both ends of the air bin varies greatly, the air grab phenomenon in the air bin can be effectively reduced when the ratio of the middle diaphragm length to the air bin width is 1∶1.5. The "人" middle diaphragm with a radian of 30°effectively reduced the local loss by 59.40%. The air bin construction ventilation can effectively reduce the length of the air duct, remove the pollutants in the tunnel and achieve a good ventilation effect.

CLC number: U453.5 Document code: A Article ID: 1673-0836(2023)03-0946-09

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 946-954

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Yang S, Ren R, Wang T, et al. Study on Optimization of Structure Parameters for Long Tunnel with Air Bin Ventilation System. Chinese Journal of Underground Space and Engineering, 2023, 19(3): 946-954. https://doi.org/10.20174/j.juse.2023.03.024

376

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 09 December 2022
Published: 01 June 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).