AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (7.6 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Suitability Analysis of Assembly Underground Utility Tunnel through Active Ground Fissures

Qiang Xu1,2, Chaoyu Bai1, Jianbing Peng1( ), Quanzhong Lu1,3, Wenyang Li1
College of Geological Engineering and Geomatics, Chang’an University, Xi’an 710054, P. R. China
State Key Laboratory of Green Building in Western China, Xian University of Architecture & Technology, Xi’an 710055, P. R. China
Field Scientific Observation and Research Station of Ground Fissures and Land Subsidence, Ministry of Natural Resources, Xi’an 710054, P. R. China
Show Author Information

Abstract

In the area where ground fissures are widely distributed, the suitability of the assembly underground utility tunnel to pass through the active ground fissures is not clear. In order to study the stress and deformation characteristics of assembly underground utility tunnels under the action of ground fissures, three-dimensional finite element models of assembly underground utility tunnels crossing the ground fissures were established. Four different settlement conditions of 10cm, 15cm, 20cm, and 25cm and four different intersection angles of 45°, 60°, 75°, and 90° were set. The numerical simulation and analysis are carried out, respectively. The calculation results show that with the increase of ground fissure activity, the deformation and longitudinal stress of the utility tunnel increase. When the settlement is close to 20cm, the maximum longitudinal tensile stress of the bottom plate of the utility tunnel reaches the tensile limit of concrete, which is located near the ground fissure in the footwall. The smaller the intersection angle between the ground fissure and the utility tunnel, the smaller the maximum longitudinal tensile stress of the utility tunnel, but the torsional effect is obvious. In the site with weak ground fissure activity, the prefabricated underground utility tunnel crossing the ground fissure shows better suitability for uneven deformation. The research results are of great significance to the study of failure mechanism and disaster prevention of assembly utility tunnels under the action of ground fissures.

CLC number: U452.2 Document code: A Article ID: 1673-0836(2023)02-0670-10

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 670-679

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Xu Q, Bai C, Peng J, et al. Suitability Analysis of Assembly Underground Utility Tunnel through Active Ground Fissures. Chinese Journal of Underground Space and Engineering, 2023, 19(2): 670-679. https://doi.org/10.20174/j.juse.2023.02.033

516

Views

0

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 17 September 2022
Published: 01 April 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).