AI Chat Paper
Note: Please note that the following content is generated by AMiner AI. SciOpen does not take any responsibility related to this content.
{{lang === 'zh_CN' ? '文章概述' : 'Summary'}}
{{lang === 'en_US' ? '中' : 'Eng'}}
Chat more with AI
PDF (4.2 MB)
Collect
Submit Manuscript AI Chat Paper
Show Outline
Outline
Show full outline
Hide outline
Outline
Show full outline
Hide outline
Open Access

Research on Cooling and Thermal Environment of Super-Long Single-Headed Tunnel Construction with High Ground Temperature

The 11th Bureau Group, the 5th Engineering Co. Ltd. of China Railway, Chongqing 400037, P. R. China
Show Author Information

Abstract

In order to solve the problem of difficulty in cooling the super-long working face of high-temperature tunnels, based on the Dechang Tunnel of Chengdu-Kunming Railway, the main causes of heat damage in high-temperature extra-long tunnels and the on-site cooling effects of ventilation cooling, ice cooling and mechanical cooling were discussed by the oretical analysis and on-site monitoring. The COMSOL Multiphysics software was used to compare the distribution law of the ambient temperature field within 100 m of the face under two methods of ventilation cooling and comprehensive cooling(mechanical ventilation + ice cube + mechanical cooling). The research results show that:(1)When the ventilation distance of single-head construction is 4.6 km, the air temperature at the outlet of the air duct is about 32 ℃; when only mechanical ventilation is provided, the ambient temperature of the tunnel face is about 38 ℃, supplemented by ice cubes and mechanical refrigeration, which basically meets the construction requirements of the face.(2)The average temperature of the tunnel face decreases with the increase of ventilation time in a negative exponential trend, and it is linearly related to the air temperature at the outlet of the air duct; compared with the comprehensive cooling method, the average temperature of the tunnel face is 3 ℃~4 ℃ higher, and the stabilization time of the face temperature is 30~50 minutes less when the temperature is cooled by pure mechanical ventilation.(3)The ambient temperature of the tunnel above the air duct is generally higher than that below the air duct; from the tunnel face to the tunnel opening, the temperature of the upper part of the tunnel presents an increasing-decreasing-increasing development trend, and a high temperature peak occurs at about 15 m from the tunnel face; in terms of the temperature of the lower part of the tunnel section, there is a big difference between ventilation cooling and comprehensive cooling. That is, the ventilation and cooling show a sudden decrease-slow decrease-slight increase trend, and the comprehensive cooling shows a surge-slow increase trend. The research results can provide guidance for the construction of similar high-temperature tunnels.

CLC number: U455 Document code: A Article ID: 1673-0836(2023)02-0632-08

References

【1】
【1】
 
 
Chinese Journal of Underground Space and Engineering
Pages 632-639

{{item.num}}

Comments on this article

Go to comment

< Back to all reports

Review Status: {{reviewData.commendedNum}} Commended , {{reviewData.revisionRequiredNum}} Revision Required , {{reviewData.notCommendedNum}} Not Commended Under Peer Review

Review Comment

Close
Close
Cite this article:
Qiao H. Research on Cooling and Thermal Environment of Super-Long Single-Headed Tunnel Construction with High Ground Temperature. Chinese Journal of Underground Space and Engineering, 2023, 19(2): 632-639. https://doi.org/10.20174/j.juse.2023.02.029

480

Views

2

Downloads

0

Crossref

0

Scopus

0

CSCD

Received: 08 November 2022
Published: 01 April 2023
© 2023 Chinese Journal of Underground Space and Engineering

This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).